Washington § 90.56.275 - Joint large-scale, multiple plan equipment deployment drills of onshore and offshore facilities and covered vessels — Requirements.

Full text of Washington Revised Code of Washington § 90.56.275 — Joint large-scale, multiple plan equipment deployment drills of onshore and offshore facilities and covered vessels — Requirements., with citation guidance and answers to common questions.

§ 90.56.275. Joint large-scale, multiple plan equipment deployment drills of onshore and offshore facilities and covered vessels — Requirements.

(1) The department is responsible for requiring joint large-scale, multiple plan equipment deployment drills of onshore and offshore facilities and covered vessels under chapter 88.46 RCW to determine the adequacy of the owner's or operator's compliance with the contingency plan requirements of this chapter and chapter 88.46 RCW. The department must order at least one drill as outlined in this section every three years, which must address situations where oils, depending on their qualities, weathering, environmental factors, and method of discharge, may submerge or sink in water.
(2) Drills required under this section must focus on, at a minimum, the following:
(a) The functional ability for multiple contingency plans to be simultaneously activated with the purpose of testing the ability for dedicated equipment and trained personnel cited in multiple contingency plans to be activated in a large-scale spill; and
(b) The operational readiness during both the first six hours of a spill and, at the department's discretion, over multiple operational periods of response.
(3) Drills required under this section may be incorporated into other drill requirements under this chapter to avoid increasing the number of drills and equipment deployments otherwise required.
(4) Each successful drill conducted under this section may be considered by the department as a drill of the underlying contingency plan and credit may be awarded to the plan holder accordingly.
(5) The department must prioritize drills for situations where oils, depending on their qualities, weathering, environmental factors, and method of discharge, may submerge or sink in water.
[ 2018 c 262 s 305.]

Notes

Findings—Intent—Report—2018 c 262: See notes following RCW 82.23B.010.

Frequently Asked Questions About Washington § 90.56.275

What does Revised Code of Washington § 90.56.275 cover?

Section 90.56.275 ("Joint large-scale, multiple plan equipment deployment drills of onshore and offshore facilities and covered vessels — Requirements.") is part of the Revised Code of Washington, the codified statutory law of Washington. It sets out the legal rule or procedure described in the text above. Statutes are amended regularly, so always verify against the official source.

How do I cite Washington § 90.56.275?

A common citation format is "Revised Code of Washington § 90.56.275" (Washington). Legal writing may require the code abbreviation, section number, and year or edition. Match the style required by your court, professor, or publisher.

Is this the official text of Washington law?

No. This page is for research and education and may not include the most recent amendments. For official current law, check the Washington official source linked on this page or consult a licensed Washington attorney.

How does Washington § 90.56.275 apply to my situation?

Statutes are interpreted in context, and application depends on your specific facts. Only a licensed attorney in Washington can advise on how this section applies to you. Contact your state or local bar association for a referral.