Washington § 90.38.110 - Construction of a water supply project — Prior review by the state of Washington water research center. (Expires July 1, 2035.)

Full text of Washington Revised Code of Washington § 90.38.110 — Construction of a water supply project — Prior review by the state of Washington water research center. (Expires July 1, 2035.), with citation guidance and answers to common questions.

§ 90.38.110. Construction of a water supply project — Prior review by the state of Washington water research center. (Expires July 1, 2035.)

(1) Prior to the appropriation of funding for the construction of a water supply project proposed in the integrated plan with a cost of greater than $100,000,000, the state of Washington water research center shall review, evaluate, and prepare comments on the cost-benefit analysis prepared for the project by the department and the United States bureau of reclamation.
(2) To the greatest extent possible, the center must use information from existing studies, supplemented by primary research, to measure and evaluate each project's benefits and costs.
(3) The center must measure and report the economic benefits of each project subject to subsection (1) of this section, so that it is clear the extent to which an individual project is expected to result in increases in fish populations, increases in the reliability of irrigation water during severe drought years, and improvements in municipal and domestic water supply.
(4) The center may enter into agreements with other state universities and with private consultants as needed to accomplish the scope of work.
(5) The center may consult, as necessary, with the department of ecology and the Yakima river basin water enhancement project work group.
(6) No more than 12 percent of any appropriations provided for the implementation of this section may be retained for administrative overhead expenses.
(7) This section expires July 1, 2035.
[ 2025 c 285 s 2; 2013 2nd sp.s. c 11 s 10.]

Notes

Effective date—2025 c 285: "This act is necessary for the immediate preservation of the public peace, health, or safety, or support of the state government and its existing public institutions, and takes effect June 30, 2025." [ 2025 c 285 s 5.]

Source: official Washington text · Last verified 2026-08-27

Frequently Asked Questions About Washington § 90.38.110

What does Revised Code of Washington § 90.38.110 cover?

Section 90.38.110 ("Construction of a water supply project — Prior review by the state of Washington water research center. (Expires July 1, 2035.)") is part of the Revised Code of Washington, the codified statutory law of Washington. It sets out the legal rule or procedure described in the text above. Statutes are amended regularly, so always verify against the official source.

How do I cite Washington § 90.38.110?

A common citation format is "Revised Code of Washington § 90.38.110" (Washington). Legal writing may require the code abbreviation, section number, and year or edition. Match the style required by your court, professor, or publisher.

Is this the official text of Washington law?

No. This page is for research and education and may not include the most recent amendments. For official current law, check the Washington official source linked on this page or consult a licensed Washington attorney.

How does Washington § 90.38.110 apply to my situation?

Statutes are interpreted in context, and application depends on your specific facts. Only a licensed attorney in Washington can advise on how this section applies to you. Contact your state or local bar association for a referral.

Sources & Verification

Not legal advice. Verify against the official source and consult a licensed attorney in Washington.