§ 82.96.005. Definitions. (Effective January 1, 2028.)

The definitions in this section apply throughout this chapter unless the context clearly requires otherwise.
(1) "Battery electric storage systems" means commercially available technology that is capable of retaining electricity, storing the energy for a period of time, and delivering the electricity after storage by chemical, thermal, mechanical, or other means that has at least 10 megawatts of storage that is not subject to the provisions of chapter 84.12 RCW. "Battery electric storage systems" does not include any form of hydroelectric power. "Battery electric storage systems" does not include a system for which payments in lieu of taxes have been made under RCW 43.52.460.
(2) "Energy storage" means commercially available technology that is capable of retaining electricity, storing the energy for a period of time, and delivering the electricity after storage by chemical, thermal, mechanical, or other means.
(3) "Personal property" has the same meaning as in RCW 84.04.080.
(4) "Qualified renewable energy facility" means an electric generating facility powered by wind or solar energy with alternating current nameplate capacity of at least 10 megawatts that is not subject to the provisions of chapter 84.12 RCW. "Qualified renewable energy facility" does not include a facility for which payments in lieu of taxes have been made under RCW 43.52.460.
(5) "Renewable energy" means energy produced by a solar or wind facility with a nameplate capacity sufficient to generate at least 10 megawatts of alternating current power.
(6) "Renewable energy storage capacity" means the battery storage capacity per megawatt.
(7) "Repowered" means the cumulative rebuild or refurbishment of a majority, or more than half the nameplate capacity, of the qualified renewable energy facility or battery electric storage system due to the facility or system reaching the end of its useful life or useful reasonable economic life as determined by the county assessor. The rebuild or refurbishment does not constitute repowering if it is part of routine major maintenance or the maintenance of or replacement of equipment that does not materially affect the expected physical or economic life of the facility.
[ 2026 c 260 s 101.]

Notes

Effective date—2026 c 260: "This act takes effect January 1, 2028." [ 2026 c 260 s 307.]
Intent—2026 c 260: See note following RCW 43.63A.770.
Tax preference performance statement exemption—Automatic expiration date exemption—2026 c 260: See note following RCW 82.96.040.

Frequently Asked Questions About Washington § 82.96.005

What does Revised Code of Washington § 82.96.005 cover?

Section 82.96.005 ("Definitions. (Effective January 1, 2028.)") is part of the Revised Code of Washington, the codified statutory law of Washington. It sets out the legal rule or procedure described in the text above. Statutes are amended regularly, so always verify against the official source.

How do I cite Washington § 82.96.005?

A common citation format is "Revised Code of Washington § 82.96.005" (Washington). Legal writing may require the code abbreviation, section number, and year or edition. Match the style required by your court, professor, or publisher.

Is this the official text of Washington law?

No. This page is for research and education and may not include the most recent amendments. For official current law, check the Washington official source linked on this page or consult a licensed Washington attorney.

How does Washington § 82.96.005 apply to my situation?

Statutes are interpreted in context, and application depends on your specific facts. Only a licensed attorney in Washington can advise on how this section applies to you. Contact your state or local bar association for a referral.

Sources & Verification

Not legal advice. Verify against the official source and consult a licensed attorney in Washington.