Washington § 82.90.050 - Requirements for recipients — Meaningful construction.

Full text of Washington Revised Code of Washington § 82.90.050 — Requirements for recipients — Meaningful construction., with citation guidance and answers to common questions.

§ 82.90.050. Requirements for recipients — Meaningful construction.

(1) The recipient of a deferral certificate under RCW 82.90.040 must begin meaningful construction on an eligible investment project within one year of receiving a deferral certificate, unless construction was delayed due to circumstances beyond the recipient's control. Lack of funding is not considered a circumstance beyond the recipient's control.
(2) If the recipient does not begin meaningful construction on an eligible investment project within one year of receiving a deferral certificate, the deferral certificate issued under RCW 82.90.040 is invalid and taxes deferred under this chapter are due immediately.
(3) A recipient of a deferral certificate under RCW 82.90.040 must notify the department and update the information originally provided in the application if the solar canopy, at the time of completion, will produce an amount of electricity that is less than 85 percent of the nameplate capacity originally assumed.
(4) Each recipient of a deferral of taxes under this chapter must file a complete annual tax performance report with the department under RCW 82.32.534 for the year the solar canopy is certified as operationally complete and for the subsequent seven years. If the solar canopy ceases to be connected to the electrical grid, the annual tax performance report is no longer required beginning on the date the solar canopy was disconnected from the electrical grid.
[ 2022 c 161 s 5.]

Notes

Tax preference performance statement—Automatic tax preference expiration—Exception—2022 c 161: See notes following RCW 82.90.040.

Source: official Washington text · Last verified 2026-08-27

Frequently Asked Questions About Washington § 82.90.050

What does Revised Code of Washington § 82.90.050 cover?

Section 82.90.050 ("Requirements for recipients — Meaningful construction.") is part of the Revised Code of Washington, the codified statutory law of Washington. It sets out the legal rule or procedure described in the text above. Statutes are amended regularly, so always verify against the official source.

How do I cite Washington § 82.90.050?

A common citation format is "Revised Code of Washington § 82.90.050" (Washington). Legal writing may require the code abbreviation, section number, and year or edition. Match the style required by your court, professor, or publisher.

Is this the official text of Washington law?

No. This page is for research and education and may not include the most recent amendments. For official current law, check the Washington official source linked on this page or consult a licensed Washington attorney.

How does Washington § 82.90.050 apply to my situation?

Statutes are interpreted in context, and application depends on your specific facts. Only a licensed attorney in Washington can advise on how this section applies to you. Contact your state or local bar association for a referral.

Sources & Verification