Washington § 82.12.965 - Exemptions — Semiconductor materials manufacturing. (Contingent effective date; contingent expiration date.)

Full text of Washington Revised Code of Washington § 82.12.965 — Exemptions — Semiconductor materials manufacturing. (Contingent effective date; contingent expiration date.), with citation guidance and answers to common questions.

§ 82.12.965. Exemptions — Semiconductor materials manufacturing. (Contingent effective date; contingent expiration date.)

(1) The provisions of this chapter do not apply with respect to the use of tangible personal property that will be incorporated as an ingredient or component of new buildings used for the manufacturing of semiconductor materials during the course of constructing such buildings or to labor and services rendered in respect to installing, during the course of constructing, building fixtures not otherwise eligible for the exemption under RCW 82.08.02565(2)(b).
(2) The eligibility requirements, conditions, and definitions in RCW 82.08.965 apply to this section, including the filing of a complete annual tax performance report with the department under RCW 82.32.534.
(3) No exemption may be taken after the expiration date of this section, however all of the eligibility criteria and limitations are applicable to any exemptions claimed before that date.
(4) Pursuant to RCW 82.32.790, this section is contingent on the siting and commercial operation of a significant semiconductor microchip fabrication facility in the state of Washington.
(5) This section expires January 1, 2034, unless the contingency in RCW 82.32.790(2) occurs.
[ 2024 c 261 s 7. Prior: 2017 3rd sp.s. c 37 s 512; (2017 3rd sp.s. c 37 s 511 expired January 1, 2018); 2017 c 135 s 30; 2010 c 114 s 129; 2003 c 149 s 6.]

Notes

Tax preference performance statement exemption—Effective date—2024 c 261 ss 2-9: See notes following RCW 82.04.241.
Effective date—2017 3rd sp.s. c 37 ss 101-104, 403, 503, 506, 508, 510, 512, 514, 516, 518, 520, 522, 524, 526, 703, 705, 707, and 801-803: See note following RCW 82.04.2404.
Expiration date—2017 3rd sp.s. c 37 ss 502, 505, 507, 509, 511, 513, 515, 517, 519, 521, 523, and 525: See note following RCW 82.04.2404.
Contingent effective date—2017 c 135; 2010 c 114: See RCW 82.32.790.
Effective date—2017 c 135: See note following RCW 82.32.534.
Finding—Intent—2010 c 114: See note following RCW 82.32.534.
Findings—Intent—2003 c 149: See note following RCW 82.04.426.

Frequently Asked Questions About Washington § 82.12.965

What does Revised Code of Washington § 82.12.965 cover?

Section 82.12.965 ("Exemptions — Semiconductor materials manufacturing. (Contingent effective date; contingent expiration date.)") is part of the Revised Code of Washington, the codified statutory law of Washington. It sets out the legal rule or procedure described in the text above. Statutes are amended regularly, so always verify against the official source.

How do I cite Washington § 82.12.965?

A common citation format is "Revised Code of Washington § 82.12.965" (Washington). Legal writing may require the code abbreviation, section number, and year or edition. Match the style required by your court, professor, or publisher.

Is this the official text of Washington law?

No. This page is for research and education and may not include the most recent amendments. For official current law, check the Washington official source linked on this page or consult a licensed Washington attorney.

How does Washington § 82.12.965 apply to my situation?

Statutes are interpreted in context, and application depends on your specific facts. Only a licensed attorney in Washington can advise on how this section applies to you. Contact your state or local bar association for a referral.

Sources & Verification

Not legal advice. Verify against the official source and consult a licensed attorney in Washington.