Washington § 80.50.300 - Unfinished fission nuclear power projects — Transfer of all or a portion of a site to a political subdivision or subdivisions of the state — Water rights.

Full text of Washington Revised Code of Washington § 80.50.300 — Unfinished fission nuclear power projects — Transfer of all or a portion of a site to a political subdivision or subdivisions of the state — Water rights., with citation guidance and answers to common questions.

§ 80.50.300. Unfinished fission nuclear power projects — Transfer of all or a portion of a site to a political subdivision or subdivisions of the state — Water rights.

(1) This section applies only to unfinished fission nuclear power projects. If a certificate holder stops construction of a fission nuclear energy facility before completion, terminates the project or otherwise resolves not to complete construction, never introduces or stores fuel for the energy facility on the site, and never operates the energy facility as designed to produce energy, the certificate holder may contract, establish interlocal agreements, or use other formal means to effect the transfer of site restoration responsibilities, which may include economic development activities, to any political subdivision or subdivisions of the state composed of elected officials. The contracts, interlocal agreements, or other formal means of cooperation may include, but are not limited to provisions effecting the transfer or conveyance of interests in the site and energy facilities from the certificate holder to other political subdivisions of the state, including costs of maintenance and security, capital improvements, and demolition and salvage of the unused energy facilities and infrastructure.
(2) If a certificate holder transfers all or a portion of the site to a political subdivision or subdivisions of the state composed of elected officials and located in the same county as the site, the council shall amend the site certification agreement to release those portions of the site that it finds are no longer intended for the development of an energy facility.
Immediately upon release of all or a portion of the site pursuant to this section, all responsibilities for maintaining the public welfare for portions of the site transferred, including but not limited to health and safety, are transferred to the political subdivision or subdivisions of the state. For sites located on federal land, all responsibilities for maintaining the public welfare for all of the site, including but not limited to health and safety, must be transferred to the political subdivision or subdivisions of the state irrespective of whether all or a portion of the site is released.
(3) The legislature finds that for all or a portion of sites that have been transferred to a political subdivision or subdivisions of the state prior to September 1, 1999, ensuring water for site restoration including economic development, completed pursuant to this section can best be accomplished by a transfer of existing surface water rights, and that such a transfer is best accomplished administratively through procedures set forth in existing statutes and rules. However, if a transfer of water rights is not possible, the department of ecology shall, within six months of the transfer of the site or portion thereof pursuant to subsection (1) of this section, create a trust water right under chapter 90.42 RCW containing between ten and twenty cubic feet per second for the benefit of the appropriate political subdivision or subdivisions of the state. The trust water right shall be used in fulfilling site restoration responsibilities, including economic development. The trust water right shall be from existing valid water rights within the basin where the site is located.
(4) For purposes of this section, "political subdivision or subdivisions of the state" means a city, town, county, public utility district, port district, or joint operating agency.
[ 2025 c 261 s 4; 2000 c 243 s 1; 1996 c 4 s 2.]

Source: official Washington text · Last verified 2026-08-27

Frequently Asked Questions About Washington § 80.50.300

What does Revised Code of Washington § 80.50.300 cover?

Section 80.50.300 ("Unfinished fission nuclear power projects — Transfer of all or a portion of a site to a political subdivision or subdivisions of the state — Water rights.") is part of the Revised Code of Washington, the codified statutory law of Washington. It sets out the legal rule or procedure described in the text above. Statutes are amended regularly, so always verify against the official source.

How do I cite Washington § 80.50.300?

A common citation format is "Revised Code of Washington § 80.50.300" (Washington). Legal writing may require the code abbreviation, section number, and year or edition. Match the style required by your court, professor, or publisher.

Is this the official text of Washington law?

No. This page is for research and education and may not include the most recent amendments. For official current law, check the Washington official source linked on this page or consult a licensed Washington attorney.

How does Washington § 80.50.300 apply to my situation?

Statutes are interpreted in context, and application depends on your specific facts. Only a licensed attorney in Washington can advise on how this section applies to you. Contact your state or local bar association for a referral.

Sources & Verification

Not legal advice. Verify against the official source and consult a licensed attorney in Washington.