Washington § 80.28.365 - Electric vehicle supply equipment, programs, or services — Electrification of transportation plan — Review — Issuance of acknowledgment.

Full text of Washington Revised Code of Washington § 80.28.365 — Electric vehicle supply equipment, programs, or services — Electrification of transportation plan — Review — Issuance of acknowledgment., with citation guidance and answers to common questions.

§ 80.28.365. Electric vehicle supply equipment, programs, or services — Electrification of transportation plan — Review — Issuance of acknowledgment.

(1) An electric utility regulated by the utilities and transportation commission under this chapter may submit to the commission an electrification of transportation plan that deploys electric vehicle supply equipment or provides other electric transportation programs, services, or incentives to support electrification of transportation. The plans should align to a period consistent with either the utility's planning horizon under its most recent integrated resource plan or the time frame of the actions contemplated in the plan, and may include:
(a) Any programs that the utility is proposing contemporaneously with the plan filing or anticipates later in the plan period;
(b) Anticipated benefits of transportation electrification, based on a forecast of electric transportation in the utilities' service territory; and
(c) Anticipated costs of programs, subject to the restrictions in RCW 80.28.360.
(2) In reviewing an electrification of transportation plan under subsection (1) of this section, the commission may consider the following: (a) The applicability of multiple options for electrification of transportation across all customer classes; (b) the impact of electrification on the utility's load, and whether demand response or other load management opportunities, including direct load control and dynamic pricing, are operationally appropriate; (c) system reliability and distribution system efficiencies; (d) interoperability concerns, including the interoperability of hardware and software systems in electrification of transportation proposals; and (e) the benefits and costs of the planned actions.
(3) The commission must issue an acknowledgment of an electrification of transportation plan within six months of the submittal of the plan. The commission may establish by rule the requirements for preparation and submission of an electrification of transportation plan. An electric utility may submit a plan under this section before or during rule-making proceedings.
(4) The commission may require a large combination utility as defined in RCW 80.86.010 to incorporate the requirements of this section into an integrated system plan established under RCW 80.86.020.
[ 2024 c 351 s 16; 2019 c 287 s 5; 2019 c 109 s 4.]

Notes

Effective date—2024 c 351: See note following RCW 80.86.010.
Effective date—2019 c 287 ss 1-7, 12, and 14-23: See note following RCW 28B.30.903.
Findings—Intent—2019 c 287: See note following RCW 28B.30.903.
Findings—Intent—2019 c 109: See note following RCW 35.92.450.

Source: official Washington text · Last verified 2026-08-27

Frequently Asked Questions About Washington § 80.28.365

What does Revised Code of Washington § 80.28.365 cover?

Section 80.28.365 ("Electric vehicle supply equipment, programs, or services — Electrification of transportation plan — Review — Issuance of acknowledgment.") is part of the Revised Code of Washington, the codified statutory law of Washington. It sets out the legal rule or procedure described in the text above. Statutes are amended regularly, so always verify against the official source.

How do I cite Washington § 80.28.365?

A common citation format is "Revised Code of Washington § 80.28.365" (Washington). Legal writing may require the code abbreviation, section number, and year or edition. Match the style required by your court, professor, or publisher.

Is this the official text of Washington law?

No. This page is for research and education and may not include the most recent amendments. For official current law, check the Washington official source linked on this page or consult a licensed Washington attorney.

How does Washington § 80.28.365 apply to my situation?

Statutes are interpreted in context, and application depends on your specific facts. Only a licensed attorney in Washington can advise on how this section applies to you. Contact your state or local bar association for a referral.

Sources & Verification

Not legal advice. Verify against the official source and consult a licensed attorney in Washington.