Washington § 79.36.570 - Grant of overflow rights.

Full text of Washington Revised Code of Washington § 79.36.570 — Grant of overflow rights., with citation guidance and answers to common questions.

§ 79.36.570. Grant of overflow rights.

The department shall have the power to grant to any person or corporation the right, privilege, and authority to perpetually back and hold water upon or over any state lands, and overflow such lands and inundate the same, whenever the department shall deem it necessary for the purpose of erecting, constructing, maintaining, or operating any water power plant, reservoir, or works for impounding water for power purposes, irrigation, mining, or other public use, but no such rights shall be granted until the value of the lands to be overflowed and any damages to adjoining lands of the state, appraised as in the case of an application to purchase such lands, shall have been paid by the person or corporation seeking the grant, and if the construction or erection of any such water power plant, reservoir, or works for impounding water for the purposes heretofore specified, shall not be commenced and diligently prosecuted and completed within such time as the department may prescribe at the time of the grant, the same may be forfeited by the department by serving written notice of such forfeiture upon the person or corporation to whom the grant was made, but the department, for good cause shown to its satisfaction, may extend the time within which such work shall be completed.
[ 2003 c 334 s 395; 1982 1st ex.s. c 21 s 174; 1927 c 255 s 102; RRS s 7797-102. Prior: 1915 c 147 ss 10, 11; 1907 c 125 ss 1, 2. Formerly RCW 79.01.408, 79.36.210.]

Notes

Intent—2003 c 334: See note following RCW 79.02.010.
Savings—Captions—Severability—Effective dates—1982 1st ex.s. c 21: See RCW 79.135.900 through 79.135.904.
Operating agencies: Chapter 43.52 RCW.

Source: official Washington text · Last verified 2026-08-27

Frequently Asked Questions About Washington § 79.36.570

What does Revised Code of Washington § 79.36.570 cover?

Section 79.36.570 ("Grant of overflow rights.") is part of the Revised Code of Washington, the codified statutory law of Washington. It sets out the legal rule or procedure described in the text above. Statutes are amended regularly, so always verify against the official source.

How do I cite Washington § 79.36.570?

A common citation format is "Revised Code of Washington § 79.36.570" (Washington). Legal writing may require the code abbreviation, section number, and year or edition. Match the style required by your court, professor, or publisher.

Is this the official text of Washington law?

No. This page is for research and education and may not include the most recent amendments. For official current law, check the Washington official source linked on this page or consult a licensed Washington attorney.

How does Washington § 79.36.570 apply to my situation?

Statutes are interpreted in context, and application depends on your specific facts. Only a licensed attorney in Washington can advise on how this section applies to you. Contact your state or local bar association for a referral.

Sources & Verification

Not legal advice. Verify against the official source and consult a licensed attorney in Washington.