Washington § 78.44.131 - Reclamation specifics — Basic objective — Modifications for metals mining and milling operations — Timeline.

Full text of Washington Revised Code of Washington § 78.44.131 — Reclamation specifics — Basic objective — Modifications for metals mining and milling operations — Timeline., with citation guidance and answers to common questions.

§ 78.44.131. Reclamation specifics — Basic objective — Modifications for metals mining and milling operations — Timeline.

The need for, and the practicability of, reclamation shall control the type and degree of reclamation in any specific instance. However, the basic objective of reclamation is to reestablish on a continuing basis the vegetative cover, slope stability, water conditions, and safety conditions suitable to the proposed subsequent use consistent with local land use plans for the surface mine site.
Each permit holder shall comply with the minimum reclamation standards in effect on the date the permit was issued and any additional reclamation standards set forth in the approved reclamation plan. The department may modify, on a site specific basis, the minimum reclamation standards for metals mining and milling operations regulated under chapter 232, Laws of 1994 in order to achieve the reclamation and closure objectives of that chapter. The basic objective of reclamation for these operations is the reestablishment on a continuing basis of vegetative cover, slope stability, water conditions, and safety conditions.
Reclamation activities, particularly those relating to control of erosion and mitigation of impacts of mining to adjacent areas, shall, to the extent feasible, be conducted simultaneously with surface mining, and in any case shall be initiated at the earliest possible time after completion of surface mining on any segment of the permit area.
All reclamation activities shall be completed not more than two years after completion or abandonment of surface mining on each segment of the area for which a reclamation permit is in force.
The department may by contract delegate enforcement of provisions of reclamation plans to counties, cities, and towns. A county, city, or town performing enforcement functions may not impose any additional fees on permit holders.
[ 1994 c 232 s 24; 1993 c 518 s 20.]

Notes

Effective date—1994 c 232 ss 1-5, 9-17, and 23-31: See RCW 78.56.901.
Captions—Severability—Effective date—1993 c 518: See notes following RCW 78.44.010.

Frequently Asked Questions About Washington § 78.44.131

What does Revised Code of Washington § 78.44.131 cover?

Section 78.44.131 ("Reclamation specifics — Basic objective — Modifications for metals mining and milling operations — Timeline.") is part of the Revised Code of Washington, the codified statutory law of Washington. It sets out the legal rule or procedure described in the text above. Statutes are amended regularly, so always verify against the official source.

How do I cite Washington § 78.44.131?

A common citation format is "Revised Code of Washington § 78.44.131" (Washington). Legal writing may require the code abbreviation, section number, and year or edition. Match the style required by your court, professor, or publisher.

Is this the official text of Washington law?

No. This page is for research and education and may not include the most recent amendments. For official current law, check the Washington official source linked on this page or consult a licensed Washington attorney.

How does Washington § 78.44.131 apply to my situation?

Statutes are interpreted in context, and application depends on your specific facts. Only a licensed attorney in Washington can advise on how this section applies to you. Contact your state or local bar association for a referral.

Sources & Verification

Not legal advice. Verify against the official source and consult a licensed attorney in Washington.