Washington § 54.16.040 - Electric energy.

Full text of Washington Revised Code of Washington § 54.16.040 — Electric energy., with citation guidance and answers to common questions.

§ 54.16.040. Electric energy.

A district may purchase, within or without its limits, electric current for sale and distribution within or without its limits, and construct, condemn and purchase, purchase, acquire, add to, maintain, conduct, and operate works, plants, transmission and distribution lines and facilities for generating electric current, operated either by water power, steam, or other methods, within or without its limits, for the purpose of furnishing the district, and the inhabitants thereof and any other persons, including public and private corporations, within or without its limits, with electric current for all uses, with full and exclusive authority to sell and regulate and control the use, distribution, rates, service, charges, and price thereof, free from the jurisdiction and control of the utilities and transportation commission, in all things, together with the right to purchase, handle, sell, or lease motors, lamps, transformers and all other kinds of equipment and accessories necessary and convenient for the use, distribution, and sale thereof: PROVIDED, That the commission shall not supply water to a privately owned utility for the production of electric energy, but may supply, directly or indirectly, to an instrumentality of the United States government or any publicly or privately owned public utilities which sell electric energy or water to the public, any amount of electric energy or water under its control, and contracts therefor shall extend over such period of years and contain such terms and conditions for the sale thereof as the commission of the district shall elect; such contract shall only be made pursuant to a resolution of the commission authorizing such contract, which resolution shall be introduced at a meeting of the commission at least ten days prior to the date of the adoption of the resolution: PROVIDED FURTHER, That it shall first make adequate provision for the needs of the district, both actual and prospective.
[ 1955 c 390 s 5. Prior: 1945 c 143 s 1(d); 1931 c 1 s 6(d); Rem. Supp. 1945 s 11610(d).]

Notes

Joint operating agency: RCW 43.52.360.
Reduced utility rates for low-income senior citizens and other low-income citizens: RCW 74.38.070.
Right of city or town to acquire electrical distribution property from P.U.D.: RCW 35.92.054.

Frequently Asked Questions About Washington § 54.16.040

What does Revised Code of Washington § 54.16.040 cover?

Section 54.16.040 ("Electric energy.") is part of the Revised Code of Washington, the codified statutory law of Washington. It sets out the legal rule or procedure described in the text above. Statutes are amended regularly, so always verify against the official source.

How do I cite Washington § 54.16.040?

A common citation format is "Revised Code of Washington § 54.16.040" (Washington). Legal writing may require the code abbreviation, section number, and year or edition. Match the style required by your court, professor, or publisher.

Is this the official text of Washington law?

No. This page is for research and education and may not include the most recent amendments. For official current law, check the Washington official source linked on this page or consult a licensed Washington attorney.

How does Washington § 54.16.040 apply to my situation?

Statutes are interpreted in context, and application depends on your specific facts. Only a licensed attorney in Washington can advise on how this section applies to you. Contact your state or local bar association for a referral.

Sources & Verification

Not legal advice. Verify against the official source and consult a licensed attorney in Washington.