Washington § 47.60.818 - Design-build ferries — Phase two.

Full text of Washington Revised Code of Washington § 47.60.818 — Design-build ferries — Phase two., with citation guidance and answers to common questions.

§ 47.60.818. Design-build ferries — Phase two.

Phase two of the request for proposals process consists of preparation of technical proposals in consultation with the department, as follows:
(1) The development of technical proposals in compliance with the detailed instructions provided in the request for proposals, including the outline specifications, and any addenda to them. Technical proposals must include the following:
(a) Design and specifications sufficient to fully depict the ferries' characteristics and identify installed equipment;
(b) Drawings showing arrangements of equipment and details necessary for the proposer to develop a firm, fixed price bid;
(c) Project schedule including vessel delivery dates; and
(d) Other appropriate items.
(2) The department shall conduct periodic reviews with each of the selected proposers to consider and critique their designs, drawings, and specifications. These reviews must be held to ensure that technical proposals meet the department's requirements and are responsive to the critiques conducted by the department during the development of technical proposals.
(3) If, as a result of the periodic technical reviews or otherwise, the department determines that it is in the best interests of the department to modify any element of the request for proposals, including the outline specifications, it shall do so by written addenda to the request for proposals.
(4) Proposers must submit final technical proposals for approval that include design, drawings, and specifications at a sufficient level of detail to fully depict the ferries' characteristics and identify installed equipment, and to enable a proposer to deliver a firm, fixed price bid to the department. The department shall reject final technical proposals that modify, fail to conform to, or are not fully responsive to and in compliance with the requirements of the request for proposals, including the outline specifications, as amended by addenda.
[ 2001 c 226 s 8.]

Notes

Findings—Purpose—2001 c 226: See note following RCW 47.20.780.

Frequently Asked Questions About Washington § 47.60.818

What does Revised Code of Washington § 47.60.818 cover?

Section 47.60.818 ("Design-build ferries — Phase two.") is part of the Revised Code of Washington, the codified statutory law of Washington. It sets out the legal rule or procedure described in the text above. Statutes are amended regularly, so always verify against the official source.

How do I cite Washington § 47.60.818?

A common citation format is "Revised Code of Washington § 47.60.818" (Washington). Legal writing may require the code abbreviation, section number, and year or edition. Match the style required by your court, professor, or publisher.

Is this the official text of Washington law?

No. This page is for research and education and may not include the most recent amendments. For official current law, check the Washington official source linked on this page or consult a licensed Washington attorney.

How does Washington § 47.60.818 apply to my situation?

Statutes are interpreted in context, and application depends on your specific facts. Only a licensed attorney in Washington can advise on how this section applies to you. Contact your state or local bar association for a referral.

Sources & Verification

Not legal advice. Verify against the official source and consult a licensed attorney in Washington.