Washington § 47.60.816 - Design-build ferries — Phase one.

Full text of Washington Revised Code of Washington § 47.60.816 — Design-build ferries — Phase one., with citation guidance and answers to common questions.

§ 47.60.816. Design-build ferries — Phase one.

Phase one of the request for proposals process consists of evaluation and selection of prequalified proposers to participate in subsequent development of technical proposals in phase two, as follows:
(1) The department shall issue a request for proposals to interested parties.
(2) The request for proposals must require that each proposer prequalify for the contract under chapter 468-310 WAC, except that the department may adopt rules for the financial prequalification of proposers for this specific contract only. The department shall modify the financial prequalification rules in chapter 468-310 WAC in order to maximize competition among financially capable and otherwise qualified proposers. In adopting these rules, the department shall consider factors including, without limitation: (a) Shipyard resources in Washington state; (b) the cost to design and construct multiple vessels under a single contract without options; and (c) the sequenced delivery schedule for the vessels.
(3) The department may use some, or all, of the nonfinancial prequalification factors as part of the evaluation factors in phase one to enable the department to select a limited number of best qualified proposers to participate in development of technical proposals in phase two.
(4) The department shall evaluate submitted proposals in accordance with the selection criteria established in the request for proposals. Selection criteria may include, but are not limited to, the following:
(a) Shipyard facilities;
(b) Organization components;
(c) Design capability;
(d) Build strategy;
(e) Experience and past performance;
(f) Ability to meet vessel delivery dates;
(g) Projected workload; and
(h) Expertise of project team and other key personnel.
(5) Upon concluding its evaluation of proposals, the department shall select the best qualified proposers in accordance with the request for proposals. The selected proposers must participate in development of technical proposals. Selection must be made in accordance with the selection criteria stated in the request for proposals. All proposers must be ranked in order of preference as derived from the same selection criteria.
[ 2001 c 226 s 7.]

Notes

Findings—Purpose—2001 c 226: See note following RCW 47.20.780.

Frequently Asked Questions About Washington § 47.60.816

What does Revised Code of Washington § 47.60.816 cover?

Section 47.60.816 ("Design-build ferries — Phase one.") is part of the Revised Code of Washington, the codified statutory law of Washington. It sets out the legal rule or procedure described in the text above. Statutes are amended regularly, so always verify against the official source.

How do I cite Washington § 47.60.816?

A common citation format is "Revised Code of Washington § 47.60.816" (Washington). Legal writing may require the code abbreviation, section number, and year or edition. Match the style required by your court, professor, or publisher.

Is this the official text of Washington law?

No. This page is for research and education and may not include the most recent amendments. For official current law, check the Washington official source linked on this page or consult a licensed Washington attorney.

How does Washington § 47.60.816 apply to my situation?

Statutes are interpreted in context, and application depends on your specific facts. Only a licensed attorney in Washington can advise on how this section applies to you. Contact your state or local bar association for a referral.

Sources & Verification

Not legal advice. Verify against the official source and consult a licensed attorney in Washington.