§ 47.60.386. Additional requirements for vessel improvement and vessel acquisition funding requests.

(1) In addition to the requirements of RCW 47.60.385(1), initial requests for, and substantial modification requests to, vessel acquisition funding must be submitted with a predesign study that:
(a) Includes a business decision case on vessel sizing;
(b) Includes an updated vessel deployment plan demonstrating maximum use of existing vessels, and an updated systemwide vessel rebuild and replacement plan;
(c) Includes an analysis that demonstrates that acquiring a new vessel or improving an existing vessel is more cost-effective than other alternatives considered. At a minimum, alternatives explored must include:
(i) Alternatives to new vessel construction that increase capacity of existing vessels;
(ii) Service level changes in lieu of adding vessel capacity; and
(iii) Acquiring existing vessels or existing vessel plans rather than wholly new vessels or vessel plans; and
(d) Demonstrates that the vessel proposed for improvement, construction, or purchase, if intended to replace an existing vessel or to place an existing vessel into inactive or reserve status, is consistent with the scheduled replacements in the rebuild and replacement plan.
(2) In addition to the requirements of RCW 47.60.385(1), initial requests for, and substantial modification requests to, vessel improvement funding must be submitted with a predesign study that includes:
(a) An explanation of any regulatory changes necessitating the improvement;
(b) The requirements under subsection (1) of this section, if the improvement modifies the capacity of a vessel;
(c) A cost-benefit analysis of any modifications designed to improve fuel efficiency, including potential impacts on vessel maintenance and repair; and
(d) An assessment of out-of-service time associated with making the improvement and ongoing preservation of the improvement.
[ 2010 c 283 s 7.]

Notes

Findings—Intent—Effective date—2010 c 283: See notes following RCW 47.60.355.

Source: official Washington text · Last verified 2026-08-27

Frequently Asked Questions About Washington § 47.60.386

What does Revised Code of Washington § 47.60.386 cover?

Section 47.60.386 ("Additional requirements for vessel improvement and vessel acquisition funding requests.") is part of the Revised Code of Washington, the codified statutory law of Washington. It sets out the legal rule or procedure described in the text above. Statutes are amended regularly, so always verify against the official source.

How do I cite Washington § 47.60.386?

A common citation format is "Revised Code of Washington § 47.60.386" (Washington). Legal writing may require the code abbreviation, section number, and year or edition. Match the style required by your court, professor, or publisher.

Is this the official text of Washington law?

No. This page is for research and education and may not include the most recent amendments. For official current law, check the Washington official source linked on this page or consult a licensed Washington attorney.

How does Washington § 47.60.386 apply to my situation?

Statutes are interpreted in context, and application depends on your specific facts. Only a licensed attorney in Washington can advise on how this section applies to you. Contact your state or local bar association for a referral.

Sources & Verification

Not legal advice. Verify against the official source and consult a licensed attorney in Washington.