Washington § 43.325.080 - Electricity and biofuel usage goals — Rules.

Full text of Washington Revised Code of Washington § 43.325.080 — Electricity and biofuel usage goals — Rules., with citation guidance and answers to common questions.

§ 43.325.080. Electricity and biofuel usage goals — Rules.

(1) By June 1, 2010, the department shall adopt rules to define practicability and clarify how state agencies will be evaluated in determining whether they have met the goals set out in RCW 43.19.648(1). At a minimum, the rules must address:
(a) Criteria for determining how the goal in RCW 43.19.648(1) will be met by June 1, 2015;
(b) Factors considered to determine compliance with the goal in RCW 43.19.648(1), including but not limited to: The regional availability of fuels; vehicle costs; differences between types of vehicles, vessels, or equipment; the cost of program implementation; and cost differentials in different parts of the state; and
(c) A schedule for phased-in progress towards meeting the goal in RCW 43.19.648(1) that may include different schedules for different fuel applications or different quantities of biofuels.
(2) By June 1, 2015, the department shall adopt rules to define practicability and clarify how local government subdivisions of the state will be evaluated in determining whether they have met the goals set out in RCW 43.19.648(2). At a minimum, the rules must address:
(a) Criteria for determining how the goal in RCW 43.19.648(2) will be met by June 1, 2018;
(b) Factors considered to determine compliance with the goal in RCW 43.19.648(2), including but not limited to: The regional availability of fuels; vehicle costs; differences between types of vehicles, vessels, or equipment; the cost of program implementation; and cost differentials in different parts of the state; and
(c) A schedule for phased-in progress towards meeting the goal in RCW 43.19.648(2) that may include different schedules for different fuel applications or different quantities of biofuels.
[ 2011 c 353 s 5; 2007 c 348 s 204.]

Notes

Intent—2011 c 353: See note following RCW 36.70A.130.

Frequently Asked Questions About Washington § 43.325.080

What does Revised Code of Washington § 43.325.080 cover?

Section 43.325.080 ("Electricity and biofuel usage goals — Rules.") is part of the Revised Code of Washington, the codified statutory law of Washington. It sets out the legal rule or procedure described in the text above. Statutes are amended regularly, so always verify against the official source.

How do I cite Washington § 43.325.080?

A common citation format is "Revised Code of Washington § 43.325.080" (Washington). Legal writing may require the code abbreviation, section number, and year or edition. Match the style required by your court, professor, or publisher.

Is this the official text of Washington law?

No. This page is for research and education and may not include the most recent amendments. For official current law, check the Washington official source linked on this page or consult a licensed Washington attorney.

How does Washington § 43.325.080 apply to my situation?

Statutes are interpreted in context, and application depends on your specific facts. Only a licensed attorney in Washington can advise on how this section applies to you. Contact your state or local bar association for a referral.

Sources & Verification

Not legal advice. Verify against the official source and consult a licensed attorney in Washington.