Washington § 43.20.310 - Water system plans — Climate resilience element.

Full text of Washington Revised Code of Washington § 43.20.310 — Water system plans — Climate resilience element., with citation guidance and answers to common questions.

§ 43.20.310. Water system plans — Climate resilience element.

(1)(a) Beginning with water system plans initiated after June 30, 2025, the department shall ensure water system plans for group A community public water systems serving 1,000 or more connections include a climate resilience element at the time of approval.
(b) The department must update its water system planning guidebook to assist water systems in implementing the climate resilience element, including guidance on any available technical and financial resources.
(c) The department shall provide technical assistance to public water systems based on their system size, location, and water source, by providing references to existing state or federal risk management, climate resiliency, or emergency management and response tools that may be used to satisfy the climate resilience element.
(d) Subject to the availability of amounts appropriated for this specific purpose, the University of Washington climate impacts group shall assist the department in the development of tools for the technical assistance to be provided in (c) of this subsection.
(2) To fulfill the requirements of the climate resilience element, water systems must:
(a) Determine which extreme weather events pose significant challenges to their system and build scenarios to identify potential impacts;
(b) Assess critical assets and the actions necessary to protect the system from the consequences of extreme weather events on system operations; and
(c) Generate reports describing the costs and benefits of the system's risk reduction strategies and capital project needs.
(3) Climate readiness projects, including planning to meet the requirements of this section and actions to protect a water system from extreme weather events, including infrastructure and design projects, are eligible for financial assistance under RCW 70A.125.180. The department must develop grant and loan eligibility criteria and consider applications from water systems that identify climate readiness projects.
[ 2023 c 228 s 17.]

Source: official Washington text · Last verified 2026-08-27

Frequently Asked Questions About Washington § 43.20.310

What does Revised Code of Washington § 43.20.310 cover?

Section 43.20.310 ("Water system plans — Climate resilience element.") is part of the Revised Code of Washington, the codified statutory law of Washington. It sets out the legal rule or procedure described in the text above. Statutes are amended regularly, so always verify against the official source.

How do I cite Washington § 43.20.310?

A common citation format is "Revised Code of Washington § 43.20.310" (Washington). Legal writing may require the code abbreviation, section number, and year or edition. Match the style required by your court, professor, or publisher.

Is this the official text of Washington law?

No. This page is for research and education and may not include the most recent amendments. For official current law, check the Washington official source linked on this page or consult a licensed Washington attorney.

How does Washington § 43.20.310 apply to my situation?

Statutes are interpreted in context, and application depends on your specific facts. Only a licensed attorney in Washington can advise on how this section applies to you. Contact your state or local bar association for a referral.

Sources & Verification

Not legal advice. Verify against the official source and consult a licensed attorney in Washington.