Washington § 4.16.310 - Actions or claims arising from construction, alteration, repair, design, planning, survey, engineering, etc., of improvements upon real property — Accrual and limitations of actions or claims.

Full text of Washington Revised Code of Washington § 4.16.310 — Actions or claims arising from construction, alteration, repair, design, planning, survey, engineering, etc., of improvements upon real property — Accrual and limitations of actions or claims., with citation guidance and answers to common questions.

§ 4.16.310. Actions or claims arising from construction, alteration, repair, design, planning, survey, engineering, etc., of improvements upon real property — Accrual and limitations of actions or claims.

All claims or causes of action as set forth in RCW 4.16.300 shall accrue, and the applicable statute of limitation shall begin to run only during the period within six years after substantial completion of construction, or during the period within six years after the termination of the services enumerated in RCW 4.16.300, whichever is later. The phrase "substantial completion of construction" shall mean the state of completion reached when an improvement upon real property may be used or occupied for its intended use. Any cause of action which has not accrued within six years after such substantial completion of construction, or within six years after such termination of services, whichever is later, shall be barred: PROVIDED, That this limitation shall not be asserted as a defense by any owner, tenant or other person in possession and control of the improvement at the time such cause of action accrues. The limitations prescribed in this section apply to all claims or causes of action as set forth in RCW 4.16.300 brought in the name or for the benefit of the state which are made or commenced after June 11, 1986.
If a written notice is filed under RCW 64.50.020 within the time prescribed for the filing of an action under this chapter, the period of time during which the filing of an action is barred under RCW 64.50.020 plus sixty days shall not be a part of the period limited for the commencement of an action, nor for the application of this section.
[ 2002 c 323 s 9; 1986 c 305 s 702; 1967 c 75 s 2.]

Notes

Preamble—Report to legislature—Applicability—Severability—1986 c 305: See notes following RCW 4.16.160.

Source: official Washington text · Last verified 2026-08-27

Frequently Asked Questions About Washington § 4.16.310

What does Revised Code of Washington § 4.16.310 cover?

Section 4.16.310 ("Actions or claims arising from construction, alteration, repair, design, planning, survey, engineering, etc., of improvements upon real property — Accrual and limitations of actions or claims.") is part of the Revised Code of Washington, the codified statutory law of Washington. It sets out the legal rule or procedure described in the text above. Statutes are amended regularly, so always verify against the official source.

How do I cite Washington § 4.16.310?

A common citation format is "Revised Code of Washington § 4.16.310" (Washington). Legal writing may require the code abbreviation, section number, and year or edition. Match the style required by your court, professor, or publisher.

Is this the official text of Washington law?

No. This page is for research and education and may not include the most recent amendments. For official current law, check the Washington official source linked on this page or consult a licensed Washington attorney.

How does Washington § 4.16.310 apply to my situation?

Statutes are interpreted in context, and application depends on your specific facts. Only a licensed attorney in Washington can advise on how this section applies to you. Contact your state or local bar association for a referral.

Sources & Verification

Not legal advice. Verify against the official source and consult a licensed attorney in Washington.