Washington § 35.77.020 - Agreements with county for planning, establishment, construction, and maintenance.

Full text of Washington Revised Code of Washington § 35.77.020 — Agreements with county for planning, establishment, construction, and maintenance., with citation guidance and answers to common questions.

§ 35.77.020. Agreements with county for planning, establishment, construction, and maintenance.

Any city or town may enter into an agreement with the county in which it is located authorizing the county to perform all or any part of the construction, repair, and maintenance of streets in such city or town at such cost as shall be mutually agreed upon. The agreement shall be approved by ordinance of the governing body of the city or town and by resolution of the board of county commissioners.
Any such agreement may include, but shall not be limited to the following:
(1) A provision that the county shall perform all or a specified part of the construction, repair, or maintenance of the city or town streets and bridges to the same standards provided by the county in unincorporated areas, or to increased standards as shall be specified which may include construction, repair, or maintenance of drainage facilities including storm sewers, sidewalks and curbings, street lighting, and traffic control devices.
(2) A provision that the county may provide engineering and administrative services necessary for the planning, establishment, construction, and maintenance of the streets of the city or town, including engineering and clerical services necessary for the establishment of local improvement districts. In providing such services the county engineer may exercise all the powers and perform all the duties vested by law or by ordinance in the city or town engineer or other officer or department charged with street administration.
(3) A provision that the city or town shall enact ordinances for the administration, establishment, construction, repair, maintenance, regulation, and protection of its streets as may be necessary to authorize the county to lawfully carry out the terms of the agreement.
[ 1965 c 7 s 35.77.020. Prior: 1961 c 245 s 1.]

Frequently Asked Questions About Washington § 35.77.020

What does Revised Code of Washington § 35.77.020 cover?

Section 35.77.020 ("Agreements with county for planning, establishment, construction, and maintenance.") is part of the Revised Code of Washington, the codified statutory law of Washington. It sets out the legal rule or procedure described in the text above. Statutes are amended regularly, so always verify against the official source.

How do I cite Washington § 35.77.020?

A common citation format is "Revised Code of Washington § 35.77.020" (Washington). Legal writing may require the code abbreviation, section number, and year or edition. Match the style required by your court, professor, or publisher.

Is this the official text of Washington law?

No. This page is for research and education and may not include the most recent amendments. For official current law, check the Washington official source linked on this page or consult a licensed Washington attorney.

How does Washington § 35.77.020 apply to my situation?

Statutes are interpreted in context, and application depends on your specific facts. Only a licensed attorney in Washington can advise on how this section applies to you. Contact your state or local bar association for a referral.

Sources & Verification

Not legal advice. Verify against the official source and consult a licensed attorney in Washington.