Washington § 35.22.640 - Public works or improvements — Electrical distribution and generating systems — Customer may contract with qualified electrical contractor.

Full text of Washington Revised Code of Washington § 35.22.640 — Public works or improvements — Electrical distribution and generating systems — Customer may contract with qualified electrical contractor., with citation guidance and answers to common questions.

§ 35.22.640. Public works or improvements — Electrical distribution and generating systems — Customer may contract with qualified electrical contractor.

Cities of the first class are relieved from complying with the provisions of RCW 35.22.620 with respect to any public work or improvement relating solely to electrical distribution and generating systems on public rights-of-way or on municipally owned property: PROVIDED, That if a city-owned electrical utility directly assesses its customers a service installation charge for a temporary service, permanent service, or expanded service, the customer may, with the written approval of the city-owned electric utility, contract with a qualified electrical contractor licensed under chapter 19.28 RCW to install any material or equipment in lieu of having city utility personnel perform the installation. In the event the city-owned electric utility denies the customer's request to utilize a private electrical contractor for such installation work, it shall provide the customer with written reasons for such denial: PROVIDED FURTHER, That nothing herein shall prevent any first-class city from operating a solid waste department utilizing its own personnel.
If a customer elects to employ a private electrical contractor as provided in this section, the private electrical contractor shall be solely responsible for any damages resulting from the installation of any temporary service, permanent service, or expanded service and the city-owned electrical utility shall be immune from any tortious conduct actions as to that installation.
[ 1983 c 217 s 1; 1975 1st ex.s. c 56 s 3.]

Source: official Washington text · Last verified 2026-08-27

Frequently Asked Questions About Washington § 35.22.640

What does Revised Code of Washington § 35.22.640 cover?

Section 35.22.640 ("Public works or improvements — Electrical distribution and generating systems — Customer may contract with qualified electrical contractor.") is part of the Revised Code of Washington, the codified statutory law of Washington. It sets out the legal rule or procedure described in the text above. Statutes are amended regularly, so always verify against the official source.

How do I cite Washington § 35.22.640?

A common citation format is "Revised Code of Washington § 35.22.640" (Washington). Legal writing may require the code abbreviation, section number, and year or edition. Match the style required by your court, professor, or publisher.

Is this the official text of Washington law?

No. This page is for research and education and may not include the most recent amendments. For official current law, check the Washington official source linked on this page or consult a licensed Washington attorney.

How does Washington § 35.22.640 apply to my situation?

Statutes are interpreted in context, and application depends on your specific facts. Only a licensed attorney in Washington can advise on how this section applies to you. Contact your state or local bar association for a referral.

Sources & Verification

Not legal advice. Verify against the official source and consult a licensed attorney in Washington.