Washington § 17.10.300 - Lien for labor, material, equipment used in controlling noxious weeds — Claim — Filing — Contents.

Full text of Washington Revised Code of Washington § 17.10.300 — Lien for labor, material, equipment used in controlling noxious weeds — Claim — Filing — Contents., with citation guidance and answers to common questions.

§ 17.10.300. Lien for labor, material, equipment used in controlling noxious weeds — Claim — Filing — Contents.

No lien created by RCW 17.10.280 exists, and no action to enforce the same shall be maintained, unless within ninety days from the date of cessation of the performance of the labor, furnishing of materials, or the supplying of equipment, a claim for the lien is filed for record as provided in this section, in the office of the county auditor of the county in which the property, or some part of the property to be affected by the claim for a lien, is situated. The claim shall state, as nearly as may be, the time of the commencement and cessation of performing the labor, furnishing the material, or supplying the equipment, the name of the county noxious weed control board that performed the labor or caused the labor to be performed, furnished the material, or supplied the equipment, a description of the property to be charged with the lien sufficient for identification, the name of the owner, or reputed owner if known, or his or her agent, and if the owner is not known, that fact shall be mentioned, the amount for which the lien is claimed, and shall be signed by the county noxious weed control board, and be verified by the oath of the county noxious weed control board, to the effect that the affiant believes that claim to be just; and the claim of lien may be amended in case of action brought to foreclose the same, by order of the court, as pleadings may be, insofar as the interest of third parties shall not be affected by such an amendment.
[ 1997 c 353 s 29; 1975 1st ex.s. c 13 s 15.]

Source: official Washington text · Last verified 2026-08-27

Frequently Asked Questions About Washington § 17.10.300

What does Revised Code of Washington § 17.10.300 cover?

Section 17.10.300 ("Lien for labor, material, equipment used in controlling noxious weeds — Claim — Filing — Contents.") is part of the Revised Code of Washington, the codified statutory law of Washington. It sets out the legal rule or procedure described in the text above. Statutes are amended regularly, so always verify against the official source.

How do I cite Washington § 17.10.300?

A common citation format is "Revised Code of Washington § 17.10.300" (Washington). Legal writing may require the code abbreviation, section number, and year or edition. Match the style required by your court, professor, or publisher.

Is this the official text of Washington law?

No. This page is for research and education and may not include the most recent amendments. For official current law, check the Washington official source linked on this page or consult a licensed Washington attorney.

How does Washington § 17.10.300 apply to my situation?

Statutes are interpreted in context, and application depends on your specific facts. Only a licensed attorney in Washington can advise on how this section applies to you. Contact your state or local bar association for a referral.

Sources & Verification

Not legal advice. Verify against the official source and consult a licensed attorney in Washington.