Washington § 58.09.130 - Monuments disturbed by construction activities — Procedure — Requirements.

Full text of Washington Revised Code of Washington § 58.09.130 — Monuments disturbed by construction activities — Procedure — Requirements., with citation guidance and answers to common questions.

§ 58.09.130. Monuments disturbed by construction activities — Procedure — Requirements.

When adequate records exist as to the location of subdivision, tract, street, or highway monuments, such monuments shall be located and referenced by or under the direction of a land surveyor at the time when streets or highways are reconstructed or relocated, or when other construction or activity affects their perpetuation. Whenever practical a suitable monument shall be reset in the surface of the new construction. In all other cases permanent witness monuments shall be set to perpetuate the location of preexisting monuments. Additionally, sufficient controlling monuments shall be retained or replaced in their original positions to enable land lines, property corners, elevations and tract boundaries to be reestablished without requiring surveys originating from monuments other than the ones disturbed by the current construction or activity.
It shall be the responsibility of the governmental agency or others performing construction work or other activity to provide for the monumentation required by this section. It shall be the duty of every land surveyor to cooperate with such governmental agency or other person in matters of maps, field notes, and other pertinent records. Monuments set to mark the limiting lines of highways, roads, or streets shall not be deemed adequate for this purpose unless specifically noted on the records of the improvement works with direct ties in bearing or azimuth and distance between those and other monuments of record.
[ 1973 c 50 s 13.]

Frequently Asked Questions About Washington § 58.09.130

What does Revised Code of Washington § 58.09.130 cover?

Section 58.09.130 ("Monuments disturbed by construction activities — Procedure — Requirements.") is part of the Revised Code of Washington, the codified statutory law of Washington. It sets out the legal rule or procedure described in the text above. Statutes are amended regularly, so always verify against the official source.

How do I cite Washington § 58.09.130?

A common citation format is "Revised Code of Washington § 58.09.130" (Washington). Legal writing may require the code abbreviation, section number, and year or edition. Match the style required by your court, professor, or publisher.

Is this the official text of Washington law?

No. This page is for research and education and may not include the most recent amendments. For official current law, check the Washington official source linked on this page or consult a licensed Washington attorney.

How does Washington § 58.09.130 apply to my situation?

Statutes are interpreted in context, and application depends on your specific facts. Only a licensed attorney in Washington can advise on how this section applies to you. Contact your state or local bar association for a referral.

Sources & Verification

Not legal advice. Verify against the official source and consult a licensed attorney in Washington.