§ 1043. Permit requirement; program development

  • (a) Program development. On or before July 1, 2026, the Secretary shall implement a surface water withdrawal
    permitting program that is consistent with section 1041 of this subchapter. The program
    shall be developed to: (1) require a permit or other authorization for surface water withdrawals based on potential
    impacts to surface waters or other factors and establish conditions of operation necessary
    to protect surface waters and the Vermont Water Quality Standards; (2) consider surface water withdrawal registration and reporting information submitted
    pursuant to section 1042 of this chapter in the establishment of permitting thresholds
    and other permitting requirements; (3) require efficient use and conservation of surface water; (4) ensure that withdrawals comply with the Vermont Water Quality Standards; (5) establish limitations on withdrawals based on low flow or drought conditions and the
    development of potential alternatives to meet surface water withdrawal needs in such
    cases; and (6) require assessment of any reasonable and feasible alternatives to proposed withdrawals
    that may have less of an impact on surface water quality. (b) Application. Application for a permit to withdraw surface water under the program established under
    subsection (a) of this section shall be made on a form provided by the Secretary and
    shall include the following information: (1) the location of each withdrawal, including the identification and type of each impacted
    surface water; (2) a description of the use or uses of the water to be withdrawn; (3) a description of the proposed method of water withdrawal; (4) the frequency and rate of the withdrawal; (5) an estimated schedule for the withdrawal; (6) the capacity of the system to be used for the withdrawal; (7) the location of the proposed return flow of the withdrawn water and whether the withdrawal
    is an interbasin transfer; (8) an estimate of the volume of water needed for the proposed use or uses; (9) a description of the alternative means considered for the proposed uses of water that
    will have less of an impact on surface water quality; and (10) any other information required by the Secretary. (c) Permits. (1) The Secretary may issue a general permit to authorize certain withdrawal activities. (2) The Secretary shall issue a general permit under this chapter for the withdrawal of
    surface water for State or municipal infrastructure projects. The general permit shall
    establish a rate and withdrawal volume that only requires notification of the Secretary
    and does not require Secretary approval prior to withdrawal. (3) A permit issued under this subchapter shall be for a period of not longer than 10
    years from the date of issuance. (d) Exceptions. A permit required under this subchapter shall not be required for: (1) surface water withdrawals for fire suppression or other public emergency response
    purposes; or (2) surface water withdrawals for irrigation for farming, livestock watering, or other
    uses for farming, as the term “farming” is defined in 6 V.S.A. § 4802. (e) Existing surface water withdrawals. (1) Snowmaking withdrawals. Existing withdrawals approved pursuant to subchapter 3 of this chapter for snowmaking
    shall be reviewed pursuant to subdivision (f)(1) of this section. (2) Nonsnowmaking withdrawals. (A) A permit required under this subchapter shall not be required until July 1, 2030 for
    an existing surface water withdrawal for nonsnowmaking purposes, provided that: (i) the existing surface water withdrawal is both registered and reported to the Secretary
    pursuant to section 1042 of this title on an annual basis; and (ii) no expansion of the existing surface water withdrawal occurs on or after January 1,
    2023. (B) For purposes of this subdivision (2), an expansion includes an increase in reported
    surface water withdrawal rate or volume or increase in reported capacity of the system. (f) Surface water withdrawals for snowmaking. (1) Existing withdrawals. Existing surface water withdrawals for snowmaking purposes that have been reviewed
    and approved pursuant to subchapter 3 of this chapter shall not require additional
    technical review by the Secretary under this subchapter, provided that the approved
    snowmaking activity is operated in compliance with the terms and conditions of the
    Secretary’s approval. For such activities, the Secretary may issue a permit under
    the rules adopted pursuant to this subchapter. (2) New withdrawals. Proposed surface water withdrawals for new snowmaking activities that require review
    pursuant to subchapter 3 of this chapter shall be reviewed by the Secretary in accordance
    with the rules adopted pursuant to section 1032 of this title. If the Secretary determines that the proposed activity is consistent with those
    rules, the Secretary shall issue a permit required by section 1043 of this section
    for that activity. (g) Enforcement. (1) The Secretary may require a person to obtain a permit under this subchapter when the
    Secretary, in the Secretary’s discretion, determines that a withdrawal or other action
    circumvents the requirements of this subchapter. (2) If the Secretary finds that a withdrawal subject to this subchapter results in the
    construction, installation, operation, or maintenance of any facility or condition
    that results in or can reasonably be expected to result in a violation of the Vermont
    Water Quality Standards, the Secretary may issue an order establishing reasonable
    and proper methods and procedures for the control of that activity in order to reduce
    or eliminate the violation. (h) Reservation. Nothing in this subchapter shall be interpreted to supersede, limit, or otherwise
    effect the Secretary’s authority to take action pursuant to section 1272 of this title or other applicable provision of law or rule. (Added 2021, No. 135 (Adj. Sess.), § 1, eff. July 1, 2022.)

Frequently Asked Questions About Vermont § 1043

What does Vermont Statutes Online § 1043 cover?

Section 1043 ("Permit requirement; program development") is part of the Vermont Statutes Online, the codified statutory law of Vermont. It sets out the legal rule or procedure described in the text above. Statutes are amended regularly, so always verify against the official source.

How do I cite Vermont § 1043?

A common citation format is "Vermont Statutes Online § 1043" (Vermont). Legal writing may require the code abbreviation, section number, and year or edition. Match the style required by your court, professor, or publisher.

Is this the official text of Vermont law?

No. This page is for research and education and may not include the most recent amendments. For official current law, check the Vermont official source linked on this page or consult a licensed Vermont attorney.

How does Vermont § 1043 apply to my situation?

Statutes are interpreted in context, and application depends on your specific facts. Only a licensed attorney in Vermont can advise on how this section applies to you. Contact your state or local bar association for a referral.

Sources & Verification

Not legal advice. Verify against the official source and consult a licensed attorney in Vermont.