Utah § 54-25-201 - Electrical power delivery quality plan for a qualified utility.

Full text of Utah Utah Code § 54-25-201 — Electrical power delivery quality plan for a qualified utility., with citation guidance and answers to common questions.

§ 54-25-201. Electrical power delivery quality plan for a qualified utility.

Effective 5/3/2023
54-25-201.  Electrical power delivery quality plan for a qualified utility.
(1) A qualified utility shall:
(a) prepare an electrical power delivery quality plan in accordance with the requirements of this chapter; and
(b) submit the electrical power delivery quality plan to the commission.
(2) An electrical power delivery quality plan under Subsection (1) shall include:
(a) a description of the procedures and standards that the qualified utility will use to assess an interconnection request to:
(i) decrease the risk that the interconnected utility-scale generation facility will adversely affect the electrical power delivery quality to other customers on the qualified utility lines; and
(ii) address adverse effects to the electrical power service quality caused by interconnected customer-owned generation systems that are discovered after the time of interconnection;
(b) a description of the equipment that the qualified utility will use to perform the assessment described in Subsection (2)(a); and
(c) a description of proposed modifications or upgrades to facilities and preventative programs that the qualified utility will implement to address any electrical power delivery quality issues that do not meet the qualified utility's interconnections policy or relevant national standards.
(3)
(a) The commission may only approve an electrical power delivery quality plan that meets the requirements of Subsection (2).
(b) If the commission does not approve a proposed electrical power delivery quality plan, the commission shall:
(i) notify the qualified utility that the proposed electrical power delivery quality plan was not approved; and
(ii) provide specific recommendations to the qualified utility about changes needed for approval of the proposed electrical power delivery quality plan.
(4) On or before October 31, 2023, and before October 31 of each year after 2023, the commission shall report to the Public Utilities, Energy, and Technology Interim Committee regarding a qualified utility's compliance with the qualified utility's electrical power delivery quality plan.


Enacted by Chapter 186, 2023 General Session

Source: official Utah text · Last verified 2026-08-27

Frequently Asked Questions About Utah § 54-25-201

What does Utah Code § 54-25-201 cover?

Section 54-25-201 ("Electrical power delivery quality plan for a qualified utility.") is part of the Utah Code, the codified statutory law of Utah. It sets out the legal rule or procedure described in the text above. Statutes are amended regularly, so always verify against the official source.

How do I cite Utah § 54-25-201?

A common citation format is "Utah Code § 54-25-201" (Utah). Legal writing may require the code abbreviation, section number, and year or edition. Match the style required by your court, professor, or publisher.

Is this the official text of Utah law?

No. This page is for research and education and may not include the most recent amendments. For official current law, check the Utah official source linked on this page or consult a licensed Utah attorney.

How does Utah § 54-25-201 apply to my situation?

Statutes are interpreted in context, and application depends on your specific facts. Only a licensed attorney in Utah can advise on how this section applies to you. Contact your state or local bar association for a referral.

Sources & Verification

Not legal advice. Verify against the official source and consult a licensed attorney in Utah.