| (5) | The board may make rules, in accordance with Title 63G, Chapter 3, Utah Administrative Rulemaking Act, and issue orders to:
| (a) | regulate activities relating to brine mining operations; |
| (b) | protect correlative rights and prevent waste; |
| (c) | form and modify brine production drilling units and brine field units; |
| (d) | regulate the spacing of brine wells for the production of brine and injection wells for the introduction of effluent into a reservoir; |
| (e) | ensure that the drilling, casing, and plugging of a brine well is done in such a manner as to prevent:
| (i) | the unauthorized escape of brine or effluent from one formation to another; |
| (ii) | the unapproved intrusion of brine and effluent into an oil or gas reservoir; |
| (iii) | the pollution of fresh water supplies throughout the state; and |
| (iv) | blowouts, caving, or seepage; |
|
| (f) | subject to Subsection (6), prevent brine well construction and related regulated activities without an adequate and approved supply of water for the drilling and completion of the brine well and authorization of the state engineer in the Division of Water Rights for brine production from the brine well as required by Title 73, Chapter 3, Appropriation; |
| (g) | regulate the storage, refining, or processing of brine and effluent; |
| (h) | require the making of reports showing:
| (i) | the location of brine wells used for production; |
| (ii) | the location of injection wells used for disposal; and |
| (iii) | the filing of well logs, production reports, and drilling records for the wells described in this Subsection (5)(h); |
|
| (i) | require the return of effluent to the same formation from which the brine was produced unless the board authorizes the disposal of effluent into one or more other formations upon finding that neither underground damage nor waste results from the disposal; |
| (j) | identify the ownership of:
| (iv) | a facility for the production, storage, treatment, transportation, refining, or processing of brine; |
|
| (k) | regulate the introduction or injection of effluent and other substances into a reservoir; |
| (l) | require the furnishing of reasonable surety to guarantee that the operator shall:
| (i) | plug each abandoned brine well; |
| (ii) | repair each brine well leaking or causing waste; and |
| (iii) | maintain and reclaim the site; |
|
| (m) | exercise continuing jurisdiction:
| (i) | over brine mining operations; |
| (ii) | to amend a permit; or |
| (iii) | to revoke a permit after notice and hearing; |
|
| (n) | require operators to keep and maintain complete and accurate records of the quantities of brine produced, sold, purchased, acquired, stored, transported, refined, and processed, and effluent injected for a period of at least six years; |
| (o) | formulate rules for the proper transportation of brine from the producing brine wells to the plant and from the plant to the injection wells and for the maintenance and surveillance of the transportation facilities; and |
| (p) | when brine mining uses produced water, resolve issues related to conflicting correlative rights between the correlative rights established under Chapter 6, Board and Division of Oil, Gas, and Mining, and the correlative rights established under Part 3, Brine Production Drilling Units, Pooling, or Fields, by:
| (i) | subordinating conflicting correlative rights under this chapter to the correlative rights established under Chapter 6, Board and Division of Oil, Gas, and Mining; and |
| (ii) | establishing a procedure before the board for addressing and resolving conflicts related to conflicting correlative rights. |
|
|