Us Code § 717z - Emergency conversion of utilities and other facilities

Full text of Us Code United States Code § 717z — Emergency conversion of utilities and other facilities, with citation guidance and answers to common questions.

§ 717z. Emergency conversion of utilities and other facilities

(a) Presidential declaration

The President may declare a natural gas supply emergency (or extend a previously declared emergency) if he finds that—

(1) a severe natural gas shortage, endangering the supply of natural gas for high-priority uses, exists or is imminent in the United States or in any region thereof; and

(2) the exercise of authorities under this section is reasonably necessary, having exhausted other alternatives (not including section 3363 of this title) to the maximum extent practicable, to assist in meeting natural gas requirements for such high-priority uses.

(b) Limitation

(1) Any declaration of a natural gas supply emergency (or extension thereof) under subsection (a), shall terminate at the earlier of—

(A) the date on which the President finds that any shortage described in subsection (a) does not exist or is not imminent; or

(B) 120 days after the date of such declaration of emergency (or extension thereof).


(2) Nothing in this subsection shall prohibit the President from extending, under subsection (a), any emergency (or extension thereof) previously declared under subsection (a), upon the expiration of such declaration of emergency (or extension thereof) under paragraph (1)(B).

(c) Prohibitions

During a natural gas emergency declared under this section, the President may, by order, prohibit the burning of natural gas by any electric powerplant or major fuel-burning installation if the President determines that—

(1) such powerplant or installation had on September 1, 1977 (or at any time thereafter) the capability to burn petroleum products without damage to its facilities or equipment and without interference with operational requirements;

(2) significant quantities of natural gas which would otherwise be burned by such powerplant or installation could be made available before the termination of such emergency to any person served by an interstate pipeline for use by such person in a high-priority use; and

(3) petroleum products will be available for use by such powerplant or installation throughout the period the order is in effect.

(d) Limitations

The President may specify in any order issued under this section the periods of time during which such order will be in effect and the quantity (or rate of use) of natural gas that may be burned by an electric powerplant or major fuel-burning installation during such period, including the burning of natural gas by an electric powerplant to meet peak load requirements. No such order may continue in effect after the termination or expiration of such natural gas supply emergency.

(e) Exemption for secondary uses

The President shall exempt from any order issued under this section the burning of natural gas for the necessary processes of ignition, startup, testing, and flame stabilization by an electric powerplant or major fuel-burning installation.

(f) Exemption for air-quality emergencies

The President shall exempt any electric powerplant or major fuel-burning installation in whole or in part, from any order issued under this section for such period and to such extent as the President determines necessary to alleviate any imminent and substantial endangerment to the health of persons within the meaning of section 7603 of title 42.

(g) Limitation on injunctive relief

(1) Except as provided in paragraph (2), no court shall have jurisdiction to grant any injunctive relief to stay or defer the implementation of any order issued under this section unless such relief is in connection with a final judgment entered with respect to such order.

(2)(A) On the petition of any person aggrieved by an order issued under this section, the United States District Court for the District of Columbia may, after an opportunity for a hearing before such court and on an appropriate showing, issue a preliminary injunction temporarily enjoining, in whole or in part, the implementation of such order.

(B) For purposes of this paragraph, subpenas for witnesses who are required to attend the District Court for the District of Columbia may be served in any judicial district of the United States, except that no writ of subpena under the authority of this section shall issue for witnesses outside of the District of Columbia at a greater distance than 100 miles from the place of holding court unless the permission of the District Court for the District of Columbia has been granted after proper application and cause shown.

(h) Definitions

For purposes of this section—

(1) The terms "electric powerplant", "powerplant", "major fuel-burning installation", and "installation" shall have the same meanings as such terms have under section 8302 of title 42.

(2) The term "petroleum products" means crude oil, or any product derived from crude oil other than propane.

(3) The term "high priority use" means any—

(A) use of natural gas in a residence;

(B) use of natural gas in a commercial establishment in amounts less than 50 Mcf on a peak day; or

(C) any use of natural gas the curtailment of which the President determines would endanger life, health, or maintenance of physical property.


(4) The term "Mcf", when used with respect to natural gas, means 1,000 cubic feet of natural gas measured at a pressure of 14.73 pounds per square inch (absolute) and a temperature of 60 degrees Fahrenheit.

(i) Use of general terms

In applying the provisions of this section in the case of natural gas subject to a prohibition order issued under this section, the term "petroleum products" (as defined in subsection (h)(2) of this section) shall be substituted for the term "heavy petroleum fuel oil" (as defined in section 717y(e)(7) of this title) if the person subject to any order under this section demonstrates to the Commission that the acquisition and use of heavy petroleum fuel oil is not technically or economically feasible.

(Pub. L. 95–617, title VI, §607, Nov. 9, 1978, 92 Stat. 3171.)


Editorial Notes

Codification

Section was enacted as part of the Public Utility Regulatory Policies Act of 1978, and not as part of the Natural Gas Act which comprises this chapter.


Statutory Notes and Related Subsidiaries

Definitions

For definitions of terms used in this section, see section 2602 of Title 16, Conservation.


Executive Documents

Delegation of Functions

Functions of President under this section, except for authority to declare, extend, and terminate a natural gas supply emergency pursuant to subsecs. (a) and (b) of this section, delegated to Secretary of Energy, see section 1–102 of Ex. Ord. No. 12235, Sept. 3, 1980, 45 F.R. 58803, set out as a note under section 3364 of this title.

CHAPTER 15C—ALASKA NATURAL GAS TRANSPORTATION

Sec.
719.
Congressional findings.
719a.
Congressional statement of purpose.
719b.
Definitions.
719c.
Federal Power Commission reviews and reports.
719d.
Federal and State officer or agency and other interested persons' reports.
719e.
Presidential decision and report.
719f.
Congressional review.
719g.
Transportation system certificates, rights-of-way, permits, leases, or other authorizations.
719h.
Judicial review.
719i.
Supplemental enforcement authority.
719j.
Export limitations.
719k.
Equal access to facilities.
719l.
Antitrust laws.
719m.
Authorization of appropriations.
719n.
Separability.
719o.
Civil rights; affirmative action of Federal officers and agencies; rules: promulgation and enforcement.

        

About This Section

15 U.S.C. § 717z is part of Title 15 of the United States Code. The United States Code is the official codification of federal statutes maintained by the Office of the Law Revision Counsel of the U.S. House of Representatives. Congress amends the Code through new public laws, which are eventually incorporated into the relevant title.

This section may be cited in legal writing as 15 U.S.C. § 717z. For the most current official text, including any recent amendments, use the official source links below. Do not rely on this page as the sole authority for legal citation or litigation.

How to Read This Statute

Statutes are organized by title, chapter, section, and subsection. Pay attention to words like "shall," "may," "and," and "or," because they determine whether a requirement is mandatory or permissive and whether multiple conditions must all be met. Historical notes and amendments often appear at the end of a section.

Using This Page

This page is intended for research and educational use. Lawyers, students, journalists, and compliance professionals can use it as a starting point, but should always verify the current text through an official government source before relying on it for legal advice, filings, or compliance decisions.

Sources

Source: official Us Code text · Last verified 2026-08-27

Frequently Asked Questions About Us Code § 717z

What does United States Code § 717z cover?

Section 717z ("Emergency conversion of utilities and other facilities") is part of the United States Code, the codified statutory law of Us Code. It sets out the legal rule or procedure described in the text above. Statutes are amended regularly, so always verify against the official source.

How do I cite Us Code § 717z?

A common citation format is "United States Code § 717z" (Us Code). Legal writing may require the code abbreviation, section number, and year or edition. Match the style required by your court, professor, or publisher.

Is this the official text of Us Code law?

No. This page is for research and education and may not include the most recent amendments. For official current law, check the Us Code official source linked on this page or consult a licensed Us Code attorney.

How does Us Code § 717z apply to my situation?

Statutes are interpreted in context, and application depends on your specific facts. Only a licensed attorney in Us Code can advise on how this section applies to you. Contact your state or local bar association for a referral.

Sources & Verification

Not legal advice. Verify against the official source and consult a licensed attorney in Us Code.