§ 16023. Project organization

(a) Major project elements

The Project shall consist of the following major program elements:

(1) High-temperature hydrogen production technology development and validation.

(2) Energy conversion technology development and validation.

(3) Nuclear fuel development, characterization, and qualification.

(4) Materials selection, development, testing, and qualification.

(5) Reactor and balance-of-plant design, engineering, safety analysis, and qualification.

(b) Project phases

The Project shall be conducted in the following phases:

(1) First project phase

A first project phase shall be conducted to—

(A) select and validate the appropriate technology under subsection (a)(1);

(B) carry out enabling research, development, and demonstration activities on technologies and components under paragraphs (2) through (4) of subsection (a);

(C) determine whether it is appropriate to combine electricity generation and hydrogen production in a single prototype nuclear reactor and plant; and

(D) carry out initial design activities for a prototype nuclear reactor and plant, including development of design methods and safety analytical methods and studies under subsection (a)(5).

(2) Second project phase

A second project phase shall be conducted to—

(A) continue appropriate activities under paragraphs (1) through (5) of subsection (a);

(B) develop, through a competitive process, a final design for the prototype nuclear reactor and plant;

(C) apply for licenses to construct and operate the prototype nuclear reactor from the Nuclear Regulatory Commission; and

(D) construct and start up operations of the prototype nuclear reactor and its associated hydrogen or electricity production facilities.

(c) Project requirements

(1) In general

The Secretary shall ensure that the Project is structured so as to maximize the technical interchange and transfer of technologies and ideas into the Project from other sources of relevant expertise, including—

(A) the nuclear power industry, including nuclear powerplant construction firms, particularly with respect to issues associated with plant design, construction, and operational and safety issues;

(B) the chemical processing industry, particularly with respect to issues relating to—

(i) the use of process energy for production of hydrogen; and

(ii) the integration of technologies developed by the Project into chemical processing environments; and


(C) international efforts in areas related to the Project, particularly with respect to hydrogen production technologies.

(2) International collaboration

(A) In general

The Secretary shall seek international cooperation, participation, and financial contributions for the Project.

(B) Assistance from international partners

The Secretary, through the Idaho National Laboratory, may contract for assistance from specialists or facilities from member countries of the Generation IV International Forum, the Russian Federation, or other international partners if the specialists or facilities provide access to cost-effective and relevant skills or test capabilities.

(C) Partner nations

The Project may involve demonstration of selected project objectives in a partner country.

(D) Generation IV International Forum

The Secretary shall ensure that international activities of the Project are coordinated with the Generation IV International Forum.

(3) Review by Nuclear Energy Research Advisory Committee

(A) In general

The Nuclear Energy Research Advisory Committee of the Department (referred to in this paragraph as the "NERAC") shall—

(i) review all program plans for the Project and all progress under the Project on an ongoing basis; and

(ii) ensure that important scientific, technical, safety, and program management issues receive attention in the Project and by the Secretary.

(B) Additional expertise

The NERAC shall supplement the expertise of the NERAC or appoint subpanels to incorporate into the review by the NERAC the relevant sources of expertise described under paragraph (1).

(C) Initial review

Not later than 180 days after August 8, 2005, the NERAC shall—

(i) review existing program plans for the Project in light of the recommendations of the document entitled "Design Features and Technology Uncertainties for the Next Generation Nuclear Plant," dated June 30, 2004; and

(ii) address any recommendations of the document not incorporated in program plans for the Project.

(D) First project phase review

On a determination by the Secretary that the appropriate activities under the first project phase under subsection (b)(1) are nearly complete, the Secretary shall request the NERAC to conduct a comprehensive review of the Project and to report to the Secretary the recommendation of the NERAC concerning whether the Project is ready to proceed to the second project phase under subsection (b)(2).

(E) Transmittal of reports to Congress

Not later than 60 days after receiving any report from the NERAC related to the Project, the Secretary shall submit to the appropriate committees of the Senate and the House of Representatives a copy of the report, along with any additional views of the Secretary that the Secretary may consider appropriate.

(Pub. L. 109–58, title VI, §643, Aug. 8, 2005, 119 Stat. 795.)

About This Section

42 U.S.C. § 16023 is part of Title 42 of the United States Code. The United States Code is the official codification of federal statutes maintained by the Office of the Law Revision Counsel of the U.S. House of Representatives. Congress amends the Code through new public laws, which are eventually incorporated into the relevant title.

This section may be cited in legal writing as 42 U.S.C. § 16023. For the most current official text, including any recent amendments, use the official source links below. Do not rely on this page as the sole authority for legal citation or litigation.

How to Read This Statute

Statutes are organized by title, chapter, section, and subsection. Pay attention to words like "shall," "may," "and," and "or," because they determine whether a requirement is mandatory or permissive and whether multiple conditions must all be met. Historical notes and amendments often appear at the end of a section.

Using This Page

This page is intended for research and educational use. Lawyers, students, journalists, and compliance professionals can use it as a starting point, but should always verify the current text through an official government source before relying on it for legal advice, filings, or compliance decisions.

Sources

Frequently Asked Questions About Us Code § 16023

What does United States Code § 16023 cover?

Section 16023 ("Project organization") is part of the United States Code, the codified statutory law of Us Code. It sets out the legal rule or procedure described in the text above. Statutes are amended regularly, so always verify against the official source.

How do I cite Us Code § 16023?

A common citation format is "United States Code § 16023" (Us Code). Legal writing may require the code abbreviation, section number, and year or edition. Match the style required by your court, professor, or publisher.

Is this the official text of Us Code law?

No. This page is for research and education and may not include the most recent amendments. For official current law, check the Us Code official source linked on this page or consult a licensed Us Code attorney.

How does Us Code § 16023 apply to my situation?

Statutes are interpreted in context, and application depends on your specific facts. Only a licensed attorney in Us Code can advise on how this section applies to you. Contact your state or local bar association for a referral.

Sources & Verification

Not legal advice. Verify against the official source and consult a licensed attorney in Us Code.