Rhode Island § 39-35-1 - Solar Decommissioning Plans

Full text of Rhode Island Rhode Island General Laws § 39-35-1 — Solar Decommissioning Plans, with citation guidance and answers to common questions.

§ 39-35-1. Solar Decommissioning Plans

R.I. Gen. Laws § 39-35-1

§ 39-35-1. Definitions.

When used in this chapter, these terms shall have the following meanings:

(1) “Decommissioning” means:

(i) The physical removal of all components of a solar photovoltaic system including, but not limited to, solar panels and associated anchoring systems and foundations, and other structures, buildings, roads, fences, cables, electrical components or associated facilities and foundations, to the extent the components of the system are not otherwise in, or proposed to be placed in, productive use;

(ii) Stabilization and/or revegetation of the site as necessary to minimize erosion and in compliance with all state and local laws; and

(iii) Disposal of all solid and hazardous waste in accordance with federal, state, and local laws, regulations, and ordinances.

(2) “Department” means the Rhode Island department of environmental management.

(3) “Ground-mounted solar system” means a solar electric system that is structurally mounted on the ground and is not roof-mounted.

(4) “Office” means the Rhode Island office of energy resources.

History of Section.
P.L. 2024, ch. 380, § 1, effective January 1, 2025; P.L. 2024, ch. 381, § 1, effective January 1, 2025.

Source: official Rhode Island text · Last verified 2026-08-27

Frequently Asked Questions About Rhode Island § 39-35-1

What does Rhode Island General Laws § 39-35-1 cover?

Section 39-35-1 ("Solar Decommissioning Plans") is part of the Rhode Island General Laws, the codified statutory law of Rhode Island. It sets out the legal rule or procedure described in the text above. Statutes are amended regularly, so always verify against the official source.

How do I cite Rhode Island § 39-35-1?

A common citation format is "Rhode Island General Laws § 39-35-1" (Rhode Island). Legal writing may require the code abbreviation, section number, and year or edition. Match the style required by your court, professor, or publisher.

Is this the official text of Rhode Island law?

No. This page is for research and education and may not include the most recent amendments. For official current law, check the Rhode Island official source linked on this page or consult a licensed Rhode Island attorney.

How does Rhode Island § 39-35-1 apply to my situation?

Statutes are interpreted in context, and application depends on your specific facts. Only a licensed attorney in Rhode Island can advise on how this section applies to you. Contact your state or local bar association for a referral.

Sources & Verification

Not legal advice. Verify against the official source and consult a licensed attorney in Rhode Island.