Rhode Island § 39-33-4 - Energy Storage Systems Act

Full text of Rhode Island Rhode Island General Laws § 39-33-4 — Energy Storage Systems Act, with citation guidance and answers to common questions.

§ 39-33-4. Energy Storage Systems Act

R.I. Gen. Laws § 39-33-4

§ 39-33-4. Periodic storage assessment and procurement.

(a) Not less than every three (3) years, the commission shall conduct a market survey to assess the capabilities of storage technologies and whether those capabilities have the potential to meet the needs of, or provide net value to, the distribution system or the bulk power system.

(1) As part of its review, the commission shall consider time and location-based constraints on the distribution and bulk power systems, including physical, economic, and environmental constraints that increase costs to the general body of ratepayers.

(2) Transmission level storage, at a minimum, shall include long-duration energy storage systems and short-duration energy storage systems that have peaking capabilities, but may include other applications.

(b) Upon a finding by the commission that storage may meet distribution system or bulk power system needs, or provide net value to the general body of ratepayers, the commission shall direct the electric distribution company with more than one hundred thousand (100,000) customers to conduct a procurement of transmission level or distribution level storage consistent with subsection (c) of this section. This review shall also consider whether any changes need to be made to previously approved storage procurement methods to meet the targets and may be conducted as part of the review of system reliability and procurement in § 39-1-27.7(b). The commission’s findings about appropriate targets and procurement shall be consistent with its least cost procurement standards and that the approved procurement is cost effective, less than the cost of available supply, reliable, prudent, and environmentally responsible.

(c) The electric distribution company shall issue and, subject to review and approval of the commission, select a reasonable, open, and competitive method of soliciting proposals from third parties for one or more services from energy storage projects connected to the transmission or distribution system in front of the meter, including, but not limited to, long-duration energy storage projects, that would achieve the goals in this chapter.

History of Section.
P.L. 2024, ch. 404, § 2, effective June 26, 2024; P.L. 2024, ch. 405, § 2, effective June 26, 2024.

Source: official Rhode Island text · Last verified 2026-08-27

Frequently Asked Questions About Rhode Island § 39-33-4

What does Rhode Island General Laws § 39-33-4 cover?

Section 39-33-4 ("Energy Storage Systems Act") is part of the Rhode Island General Laws, the codified statutory law of Rhode Island. It sets out the legal rule or procedure described in the text above. Statutes are amended regularly, so always verify against the official source.

How do I cite Rhode Island § 39-33-4?

A common citation format is "Rhode Island General Laws § 39-33-4" (Rhode Island). Legal writing may require the code abbreviation, section number, and year or edition. Match the style required by your court, professor, or publisher.

Is this the official text of Rhode Island law?

No. This page is for research and education and may not include the most recent amendments. For official current law, check the Rhode Island official source linked on this page or consult a licensed Rhode Island attorney.

How does Rhode Island § 39-33-4 apply to my situation?

Statutes are interpreted in context, and application depends on your specific facts. Only a licensed attorney in Rhode Island can advise on how this section applies to you. Contact your state or local bar association for a referral.

Sources & Verification

Not legal advice. Verify against the official source and consult a licensed attorney in Rhode Island.