Pennsylvania § 8911 - Improvement and extension authorizations.

Full text of Pennsylvania Pennsylvania Consolidated Statutes § 8911 — Improvement and extension authorizations., with citation guidance and answers to common questions.

§ 8911. Improvement and extension authorizations.

In order to facilitate vehicular traffic within and across this Commonwealth, the commission is hereby authorized and empowered to construct, operate and maintain turnpike extensions and turnpike improvements at such specific locations and according to such schedule as shall be deemed feasible and approved by the commission, together with connecting roads, storm water management systems, interchanges, slip ramps, tunnels and bridges, subject to the waiver of the Federal toll prohibition provisions where applicable, as follows:

(1) Widen turnpike to six lanes between the Northeast Extension and the Delaware River Interchange.

(2) Construct turnpike interchange with Interstate Route 95 in Bucks County.

(3) Construct turnpike interchange with Interstate Route 476 in Montgomery County.

(4) Construct turnpike interchange with Keyser Avenue in Lackawanna County.

(5) Construct extensions to the existing turnpike from a point westerly of existing Interchange 2 extending northerly to a connection with the existing interchange between U.S. Route 422 and proposed State Route 60 in Lawrence County and extending southerly to a connection with existing State Route 60 in Beaver County at or near State Route 51.

(6) Construct an extension to the turnpike from a point at or near Interchange 8 in Westmoreland County extending northerly to an interchange with State Route 66 northwest of Greensburg and continuing northerly to an interchange with U.S. Route 22 south of Delmont.

(7) Construct an additional Lehigh Tunnel on the Northeast Extension of the turnpike.

(8) Construct a private turnpike interchange directly connected to the New Cumberland Army Depot. The commission may commence construction of the private turnpike interchange notwithstanding the construction schedule established by this section.

(9) Construct an interchange on the Northeast Extension with State Route 903 in Carbon County. The commission may commence construction of this interchange notwithstanding the construction schedule established by this section.

(10) Other slip ramps and interchanges as the commission may determine.

(July 18, 2007, P.L.169, No.44, eff. imd.)

2007 Amendment. Act 44 amended the intro. par. and added par. (10).

Cross References. Section 8911 is referred to in sections 8913, 8914, 8915 of this title.

Frequently Asked Questions About Pennsylvania § 8911

What does Pennsylvania Consolidated Statutes § 8911 cover?

Section 8911 ("Improvement and extension authorizations.") is part of the Pennsylvania Consolidated Statutes, the codified statutory law of Pennsylvania. It sets out the legal rule or procedure described in the text above. Statutes are amended regularly, so always verify against the official source.

How do I cite Pennsylvania § 8911?

A common citation format is "Pennsylvania Consolidated Statutes § 8911" (Pennsylvania). Legal writing may require the code abbreviation, section number, and year or edition. Match the style required by your court, professor, or publisher.

Is this the official text of Pennsylvania law?

No. This page is for research and education and may not include the most recent amendments. For official current law, check the Pennsylvania official source linked on this page or consult a licensed Pennsylvania attorney.

How does Pennsylvania § 8911 apply to my situation?

Statutes are interpreted in context, and application depends on your specific facts. Only a licensed attorney in Pennsylvania can advise on how this section applies to you. Contact your state or local bar association for a referral.

Sources & Verification

Not legal advice. Verify against the official source and consult a licensed attorney in Pennsylvania.