(A) As used in this chapter: (1) “ Major utility facility ” means: (a) An electric transmission line and associated facilities of a design capacity of one
hundred twenty-five kilovolts or more; (b) A gas or natural gas transmission line and associated facilities designed for, or
capable of, transporting gas or natural gas at pressures in excess of one hundred
twenty-five pounds per square inch. “Major utility facility” does not include electric, gas, or natural gas distributing
lines and gas or natural gas gathering lines and associated facilities as defined
by the public utilities commission; facilities owned or operated by industrial firms,
persons, or institutions that produce or transmit gas or natural gas, or electricity
primarily for their own use or as a byproduct of their operations; gas or natural
gas transmission lines and associated facilities over which an agency of the United
States has certificate jurisdiction; facilities owned or operated by a person furnishing
gas or natural gas directly to fifteen thousand or fewer customers within this state. (2) “Person” has the meaning set forth in section 4906.01 of the Revised Code . (3) “Advanced transmission technologies” has the same meaning as in section 4906.01 of the Revised Code . (B) Each person owning or operating a gas or natural gas transmission line and associated
facilities within this state over which an agency of the United States has certificate
jurisdiction shall furnish to the commission a copy of the energy information filed
by the person with that agency of the United States. (C) Each person owning or operating a major utility facility within this state, or furnishing
gas, natural gas, or electricity directly to more than fifteen thousand customers
within this state shall furnish a report to the commission for its review. The report shall be furnished annually, except that for a gas or natural gas company
the report shall be furnished every three years. The report shall be termed the long-term forecast report and shall contain: (1) A year-by-year, ten-year forecast of annual energy demand, peak load, reserves, and
a general description of the resource planning projections to meet demand; (2) A range of projected loads during the period; (3) A description of major utility facilities planned to be added or taken out of service
in the next ten years, including, to the extent the information is available, prospective
sites for transmission line locations; (4) For gas and natural gas, a projection of anticipated supply, supply prices, and sources
of supply over the forecast period; (5) A description of proposed changes in the transmission system planned for the next
five years; (6) A month-by-month forecast of both energy demand and peak load for electric utilities,
and gas sendout for gas and natural gas utilities, for the next two years. The report shall describe the major utility facilities that, in the judgment of
such person, will be required to supply system demands during the forecast period. The report from a gas or natural gas utility shall cover the ten- and five-year
periods next succeeding the date of the report, and the report from an electric utility
shall cover the twenty-, ten-, and five-year periods next succeeding the date of the
report. Each report shall be made available to the public and furnished upon request to
municipal corporations and governmental agencies charged with the duty of protecting
the environment or of planning land use. The report shall be in such form and shall contain such information as may be prescribed
by the commission. Each person not owning or operating a major utility facility within this state and
serving fifteen thousand or fewer gas or natural gas, or electric customers within
this state shall furnish such information as the commission requires. (7) For electric transmission, a person shall include an evaluation and report of the
potential use of, or investment in, one or more advanced transmission technologies
to enable the electric utility to safely, reliably, efficiently, and cost-effectively
meet electric system demand through its major utility facilities. The report shall identify which advanced transmission technologies were considered
as a part of the review of the major utility facilities for the next five years. A person shall also include a cost evaluation comparing costs of traditional transmission
investments and costs of advanced transmission technologies for the projects considered
on the major utility facilities applied individually, together, or in sequence. The report shall also include an advanced transmission technology congestion mitigation
study to cost-effectively maximize the delivery of energy resources in the near term
that: (a) Identifies locations on the entity's transmission system where congestion has occurred
for a total of fifty hours per year or more during the last three years or is likely
to occur during the next five years, including due to planned transmission outages
or other factors; (b) Estimates the frequency of congestion at each location and the increased cost to
ratepayers resulting from the substitution of higher-priced electricity; (c) Evaluates the technical feasibility and estimates the cost of installing one or more
advanced transmission technologies to address each instance of grid congestion identified
in division (C)(7)(a) of this section and projects the grid-enhancing technology's
efficacy in reducing congestion; (d) Analyzes the cost-effectiveness of installing grid-enhancing technologies to address
each instance of congestion identified in division (C)(7)(a) of this section by using
the information developed in division (C)(7)(c) of this section to calculate the payback
period of each installation, using a methodology developed by the commission; (e) Proposes an implementation plan, including a schedule and cost estimate, to install
grid-enhancing technologies at each congestion point at which the payback period is
less than or equal to a value determined by the commission, in order to maximize transmission
system capacity, and explains the entity's current line rating methodology. (D) The commission shall: (1) Review and comment on the reports filed under division (C) of this section, and make
the information contained in the reports readily available to the public and other
interested government agencies; (2) Compile and publish each year the general locations of proposed and existing transmission
line routes within its jurisdiction as identified in the reports filed under division
(C) of this section, identifying the general location of such sites and routes and
the approximate year when construction is expected to commence, and to make such information
readily available to the public, to each newspaper of daily or weekly circulation
within the area affected by the proposed site and route, and to interested federal,
state, and local agencies; (3) Hold a public hearing upon the showing of good cause to the commission by an interested
party. If a hearing is held, the commission shall fix a time for the hearing, which shall
be not later than ninety days after the report is filed, and publish notice of the
date, time of day, and location of the hearing in a newspaper of general circulation
in each county in which the person furnishing the report has or intends to locate
a major utility facility and will provide service during the period covered by the
report. The notice shall be published not less than fifteen nor more than thirty days before
the hearing and shall state the matters to be considered. (4) Require such information from persons subject to its jurisdiction as necessary to
assist in the conduct of hearings and any investigation or studies it may undertake; (5) Conduct any studies or investigations that are necessary or appropriate to carry
out its responsibilities under this section. (6) Review and evaluate that advanced transmission technologies were properly reported
in accordance with division (C)(7) of this section and allow stakeholders to provide
comments. (7) Approve advanced transmission technology congestion mitigation implementation plans,
including cost recovery. (E)(1) The scope of the hearing held under division (D)(3) of this section shall be limited
to issues relating to forecasting. The power siting board, the office of consumers' counsel, and all other persons
having an interest in the proceedings shall be afforded the opportunity to be heard
and to be represented by counsel. The commission may adjourn the hearing from time to time. (2) The hearing shall include, but not be limited to, a review of: (a) The projected loads and energy requirements for each year of the period; (b) The estimated installed capacity and supplies to meet the projected load requirements. (F) Based upon the report furnished pursuant to division (C) of this section and the
hearing record, the commission, within ninety days from the close of the record in
the hearing, shall determine if: (1) All information relating to current activities, facilities agreements, and published
energy policies of the state has been completely and accurately represented; (2) The load requirements are based on substantially accurate historical information
and adequate methodology; (3) The forecasting methods consider the relationships between price and energy consumption; (4) The report identifies and projects reductions in energy demands due to energy conservation
measures in the industrial, commercial, residential, transportation, and energy production
sectors in the service area; (5) Utility company forecasts of loads and resources are reasonable in relation to population
growth estimates made by state and federal agencies, transportation, and economic
development plans and forecasts, and make recommendations where possible for necessary
and reasonable alternatives to meet forecasted electric power demand; (6) The report considers plans for expansion of the regional power grid and the planned
facilities of other utilities in the state; (7) All assumptions made in the forecast are reasonable and adequately documented. (G) The commission shall adopt rules under section 111.15 of the Revised Code to establish criteria for evaluating the long-term forecasts of needs for gas and
electric transmission service, to conduct hearings held under this section, to establish
reasonable fees to defray the direct cost of the hearings and the review process,
and such other rules as are necessary and convenient to implement this section. (H) The hearing record produced under this section and the determinations of the commission
shall be introduced into evidence and shall be considered in determining the basis
of need for power siting board deliberations under division (A)(1) of section 4906.10 of the Revised Code . The hearing record produced under this section shall be introduced into evidence
and shall be considered by the commission in its initiation of programs, examinations,
and findings under section 4905.70 of the Revised Code , and shall be considered in the commission's determinations with respect to the establishment
of just and reasonable rates under section 4909.15 of the Revised Code and financing utility facilities and authorizing issuance of all securities under sections 4905.40 , 4905.401 , 4905.41 , and 4905.42 of the Revised Code . The forecast findings also shall serve as the basis for all other energy planning
and development activities of the state government where electric and gas data are
required. (I)(1) No court other than the supreme court shall have power to review, suspend, or delay
any determination made by the commission under this section, or enjoin, restrain,
or interfere with the commission in the performance of official duties. A writ of mandamus shall not be issued against the commission by any court other
than the supreme court. (2) A final determination made by the commission shall be reversed, vacated, or modified
by the supreme court on appeal, if, upon consideration of the record, such court is
of the opinion that such determination was unreasonable or unlawful. The proceeding to obtain such reversal, vacation, or modification shall be by notice
of appeal, filed with the commission by any party to the proceeding before it, against
the commission, setting forth the determination appealed from and errors complained
of. The notice of appeal shall be served, unless waived, upon the commission by leaving
a copy at the office of the chairperson of the commission at Columbus. The court may permit an interested party to intervene by cross-appeal. (3) No proceeding to reverse, vacate, or modify a determination of the commission is
commenced unless the notice of appeal is filed within sixty days after the date of
the determination.
Frequently Asked Questions About Ohio § 4935.04
What does Ohio Revised Code § 4935.04 cover?
Section 4935.04 is part of the Ohio Revised Code, the codified statutory law of Ohio. It sets out the legal rule or procedure described in the text above. Statutes are amended regularly, so always verify against the official source.
How do I cite Ohio § 4935.04?
A common citation format is "Ohio Revised Code § 4935.04" (Ohio). Legal writing may require the code abbreviation, section number, and year or edition. Match the style required by your court, professor, or publisher.
Is this the official text of Ohio law?
No. This page is for research and education and may not include the most recent amendments. For official current law, check the Ohio official source linked on this page or consult a licensed Ohio attorney.
How does Ohio § 4935.04 apply to my situation?
Statutes are interpreted in context, and application depends on your specific facts. Only a licensed attorney in Ohio can advise on how this section applies to you. Contact your state or local bar association for a referral.
Sources & Verification
Not legal advice. Verify against the official source and consult a licensed attorney in Ohio.