§ 113A-115. 1. Limitations on erosion control structures.

As used in this section: "Erosion control structure" means a breakwater, bulkhead, groin, jetty, revetment, seawall, or any similar structure. "Estuarine shoreline" means all shorelines that are not ocean shorelines that border estuarine waters as defined in G.S. 113A-113(b)(2). "Ocean shoreline" means the Atlantic Ocean, the oceanfront beaches, and frontal dunes. The term "ocean shoreline" includes an ocean inlet and lands adjacent to an ocean inlet but does not include that portion of any inlet and lands adjacent to the inlet that exhibits characteristics of estuarine shorelines. "Terminal groin" means one or more structures constructed at the terminus of an island or on the side of an inlet, with a main stem generally perpendicular to the beach shoreline, that is primarily intended to protect the terminus of the island from shoreline erosion and inlet migration. A "terminal groin" shall be pre-filled with beach quality sand and allow sand moving in the littoral zone to flow past the structure. A "terminal groin" may include other design features, such as a number of smaller supporting structures, that are consistent with sound engineering practices and as recommended by a professional engineer licensed to practice pursuant to Chapter 89C of the General Statutes. A "terminal groin" is not a jetty. No person shall construct a permanent erosion control structure in an ocean shoreline. The Commission shall not permit the construction of a temporary erosion control structure that consists of anything other than sandbags in an ocean shoreline. This subsection shall not apply to any of the following: Any permanent erosion control structure that is approved pursuant to an exception set out in a rule adopted by the Commission prior to July 1, 2003. Any permanent erosion control structure that was originally constructed prior to July 1, 1974, and that has since been in continuous use to protect an inlet that is maintained for navigation. Any terminal groin permitted pursuant to this section. This section shall not be construed to limit the authority of the Commission to adopt rules to designate or protect areas of environmental concern, to govern the use of sandbags, or to govern the use of erosion control structures in estuarine shorelines. The Commission may renew a permit for a permanent erosion control structure originally permitted pursuant to a variance granted by the Commission prior to July 1, 1995, if the Commission finds that: (i) the structure will not be enlarged beyond the dimensions set out in the original permit; (ii) there is no practical alternative to replacing the structure that will provide the same or similar benefits; and (iii) the replacement structure will comply with all applicable laws and with all rules, other than the rule or rules with respect to which the Commission granted the variance, that are in effect at the time the structure is replaced. The Commission may authorize the repair or replacement of a temporary erosion control structure that was originally permitted prior to July 1, 1995, if the Commission finds that (i) the structure is located adjacent to an intertidal marine rock outcropping designated by the State as a Natural Heritage Area pursuant to Part 42 of Article 2 of Chapter 143B of the General Statutes and (ii) the replacement structure will comply with all applicable laws and with all rules, other than the rule or rules with respect to which the Commission granted the variance, that are in effect at the time the structure is replaced. Any rule that prohibits permanent erosion control structures shall not apply to terminal groins permitted pursuant to this section. In addition to the requirements of Part 4 of Article 7 of Chapter 113A of the General Statutes, an applicant for a permit for the construction of a terminal groin shall submit all of the following to the Commission: Information to demonstrate that structures or infrastructure are threatened by erosion. An environmental impact statement that satisfies the requirements of G.S. 113A-4. An environmental impact statement prepared pursuant to the National Environmental Policy Act (NEPA), 42 U.S.C. § 4321, et seq., for the construction of the terminal groin shall satisfy the requirements of this subdivision. A list of property owners and local governments that may be affected by the construction of the proposed terminal groin and its accompanying beach fill project and proof that the property owners and local governments have been notified of the application for construction of the terminal groin and its accompanying beach fill project. A plan for the construction and maintenance of the terminal groin and its accompanying beach fill project prepared by a professional engineer licensed to practice pursuant to Chapter 89C of the General Statutes. A plan for the management of the inlet and the estuarine and ocean shorelines immediately adjacent to and under the influence of the inlet. The inlet management plan monitoring and mitigation requirements must be reasonable and not impose requirements whose costs outweigh the benefits. The inlet management plan is not required to address sea level rise. The inlet management plan shall do all of the following relative to the terminal groin and its accompanying beach fill project: Describe the post-construction activities that the applicant will undertake to monitor the impacts on coastal resources. Define the baseline for assessing any adverse impacts and the thresholds for when the adverse impacts must be mitigated. Provide for mitigation measures to be implemented if adverse impacts reach the thresholds defined in the plan. Provide for modification or removal of the terminal groin if the adverse impacts cannot be mitigated. Proof of financial assurance verified by the Commission or the Secretary of Environmental Quality in the form of a bond, insurance policy, escrow account, guaranty, local government taxing or assessment authority, a property owner association's approved assessment, or other financial instrument or combination of financial instruments that is adequate to cover the cost of implementing all of the following components of the inlet management plan: Long-term maintenance and monitoring of the terminal groin. Implementation of mitigation measures. Modification or removal of the terminal groin. Repealed by Session Laws 2013-384, s. 3(a), effective August 23, 2013, and applicable to permit applications submitted on or after that date. The Commission shall issue a permit for the construction of a terminal groin if the Commission finds no grounds for denying the permit under G.S. 113A-120 and the Commission finds all of the following: The applicant has complied with all of the requirements of subsection (e) of this section. Repealed by Session Laws 2013-384, s. 3(a), effective August 23, 2013, and applicable to permit applications submitted on or after that date. The terminal groin will be accompanied by a concurrent beach fill project to prefill the groin. Construction and maintenance of the terminal groin will not result in significant adverse impacts to private property or to the public recreational beach. In making this finding, the Commission shall take into account the potential benefits of the project, including protection of the terminus of the island from shoreline erosion and inlet migration, beaches, protective dunes, wildlife habitats, roads, homes, and infrastructure, and mitigation measures, including the accompanying beach fill project, that will be incorporated into the project design and construction and the inlet management plan. The inlet management plan is adequate for purposes of monitoring the impacts of the proposed terminal groin and mitigating any adverse impacts identified as a result of the monitoring. Except to the extent expressly modified by this section, the project complies with State guidelines for coastal development adopted by the Commission pursuant to G.S. 113A-107. The Commission may issue no more than six permits for the construction of a terminal groin pursuant to this section, provided that two of the six permits may be issued only for the construction of terminal groins on the sides of New River Inlet in Onslow County and Bogue Inlet between Carteret and Onslow Counties. A local government may not use funds generated from any of the following financing mechanisms for any activity related to the terminal groin or its accompanying beach fill project: Special obligation bonds issued pursuant to Article 7A of Chapter 159 of the General Statutes. Nonvoted general obligation bonds issued pursuant to G.S. 159-48(b)(4). Financing contracts entered into under G.S. 160A-20 or G.S. 159-148. No later than January 1, 2019, and every five years thereafter, the Coastal Resources Commission shall report to the Environmental Review Commission on the implementation of this section. The report shall provide a detailed description of each proposed and permitted terminal groin and its accompanying beach fill project, including the information required to be submitted pursuant to subsection (e) of this section. For each permitted terminal groin and its accompanying beach fill project, the report shall also provide all of the following: The findings of the Commission required pursuant to subsection (f) of this section. The status of construction and maintenance of the terminal groin and its accompanying beach fill project, including the status of the implementation of the plan for construction and maintenance and the inlet management plan. A description and assessment of the benefits of the terminal groin and its accompanying beach fill project, if any. A description and assessment of the adverse impacts of the terminal groin and its accompanying beach fill project, if any, including a description and assessment of any mitigation measures implemented to address adverse impacts. History (2003-427, s. 3; 2004-195, s. 1.2; 2004-203, s. 43; 2011-387, s. 1; 2012-201, s. 2(a); 2013-384, s. 3(a); 2015-241, ss. 14.6(r), 14.30(v); 2017-10, s. 4.19; 2018-114, s. 15; 2020-3, s. 4.30(b).) Editor's Note. - Session Laws 2011-387, in its preamble, provides: "Whereas, it has been the policy of the State of North Carolina since 1985, as stated in the Coastal Area Management Act and rules adopted pursuant to the act, to give preference to nonstructural responses to erosion, including relocation of threatened structures, beach nourishment, inlet relocation, and the temporary use of sandbags for short-term stabilization; and "Whereas, a terminal groin is a permanent erosion control structure that is constructed on the side of an inlet at the terminus of an island generally perpendicular to the shoreline to limit or control sediment passage into the inlet channel; and "Whereas, a terminal groin may reduce beach erosion, reduce the frequency of beach nourishment projects, and slow the migration of inlets; and "Whereas, the use of terminal groins on inlet beaches may adversely impact the value and enjoyment of adjacent properties, damage the public beach, obstruct public access to the beach and to navigable waters, and result in increased erosion to adjacent and downdrift properties; and "Whereas, due to the uncertainties associated with the costs and benefits of terminal groins, it is reasonable to authorize the Coastal Resources Commission to establish a terminal groin pilot program under which the Commission may permit the construction of up to four terminal groins under certain conditions; and "Whereas, it is reasonable to authorize the Coastal Resources Commission to permit the construction of a terminal groin under the pilot program if the Commission finds that (i) structures or infrastructure are imminently threatened by erosion and that nonstructural approaches to erosion control are impractical; (ii) the terminal groin will be accompanied by a concurrent beach fill project; (iii) construction and maintenance of the terminal groin will not result in significant adverse impacts to private property or to the public recreational beach; (iv) the terminal groin will be managed pursuant to an inlet management plan; and (v) there are sufficient financial resources to cover the costs associated with the terminal groin; Now, therefore," Session Laws 2011-387, s. 4, provides: "No State funds may be spent for any activities related to a terminal groin and its accompanying beach fill project permitted pursuant to G.S. 113A-115.1 , as amended by Section 1 of this act, unless the General Assembly enacts legislation appropriating funds explicitly for such purpose. This section shall not apply to any beach fill or beach nourishment project initiated prior to the effective date of this act." Session Laws 2011-387, s. 5, provided: "No later than September 1 of each year, the Coastal Resources Commission shall report to the Environmental Review Commission on the implementation of this act. The report shall provide a detailed description of each proposed and permitted terminal groin and its accompanying beach fill project, including the information required to be submitted pursuant to subsection (e) of G.S. 113A-115.1 , as amended by Section 1 of this act. For each permitted terminal groin and its accompanying beach fill project, the report shall also provide all of the following: "(1) The findings of the Commission required pursuant to subsection (f) of G.S. 113A-115.1 , as amended by Section 1 of this act. "(2) The status of construction and maintenance of the terminal groin and its accompanying beach fill project, including the status of the implementation of the plan for construction and maintenance and the inlet management plan. "(3) A description and assessment of the benefits of the terminal groin and its accompanying beach fill project, if any. "(4) A description and assessment of the adverse impacts of the terminal groin and its accompanying beach fill project, if any, including a description and assessment of any mitigation measures implemented to address adverse impacts." Session Laws 2012-201, s. 2(b), repealed Session Laws 2011-387, s. 5, and a substantially similar provision was codified in the text of subsection (i) of this section by Session Laws 2012-201, s. 2(a). Session Laws 2015-241, s. 1.1, provides: "This act shall be known as 'The Current Operations and Capital Improvements Appropriations Act of 2015.'" Session Laws 2015-241, s. 33.4, provides: "Except for statutory changes or other provisions that clearly indicate an intention to have effects beyond the 2015-2017 fiscal biennium, the textual provisions of this act apply only to funds appropriated for, and activities occurring during, the 2015-2017 fiscal biennium." Session Laws 2015-241, s. 33.6, is a severability clause. Session Laws 2015-241, s. 14.6(p), provides: "The Coastal Resources Commission shall amend its rules for the use of temporary erosion control structures to provide for all of the following: "(1) Allow the placement of temporary erosion control structures on a property that is experiencing coastal erosion even if there are no imminently threatened structures on the property if the property is adjacent to a property where temporary erosion control structures have been placed. "(2) Allow the placement of contiguous temporary erosion control structures from one shoreline boundary of a property to the other shoreline boundary, regardless of proximity to an imminently threatened structure. "(3) The termination date of all permits for contiguous temporary erosion control structures on the same property shall be the same and shall be the latest termination date for any of the permits. "(4) The replacement, repair, or modification of damaged temporary erosion control structures that are either legally placed with a current permit or legally placed with an expired permit, but the status of the permit is being litigated by the property owner." Session Laws 2015-241, s. 14.6(q), provides: "The Coastal Resources Commission shall adopt temporary rules to implement subsection (p) of this section no later than December 31, 2015. The Commission shall also adopt permanent rules to implement this section." Session Laws 2017-10, s. 3.14(a), effective May 4, 2017, repealed Session Laws 2015-241, s. 14.6(p) and (q). Session Laws 2017-10, s. 3.14(b), provides: "Notwithstanding G.S. 150B-21.1 A(a), the Coastal Resources Commission may adopt an emergency rule for the use of temporary erosion control structures consistent with the amendments to the temporary erosion control structure rules adopted by the Commission as agenda item CRC-16-23 on May 11, 2016, with any further modifications in the Commission's discretion. The Commission shall also adopt temporary and permanent rules to implement this section." Sessions Laws 2018-114, s. 29, is a severability clause. Session Laws 2020-3, s. 5, is a severability clause. Effect of Amendments. - Session Laws 2004-195, s. 1.2, effective August 17, 2004, substituted "control" for "coastal" in subsection (b). Session Laws 2004-203, s. 43, effective August 17, 2004, substituted "control" for "coastal" in the last sentence of subsection (b). Session Laws 2011-387, s. 1, effective June 28, 2011, added subdivisions (a)(1a) and (a)(3); subdivided former subsection (b), adding "of the following" in the introductory paragraph, adding the subdivision (b)(1) and (b)(2) designations, and therein making minor stylistic changes, and adding subdivision (b)(3) and the subsection (b1) designation; in subsection (c), twice substituted "July 1, 1995" for "1 July 1995"; and added subsections (d) through (h). Session Laws 2012-201, s. 2(a), effective August 1, 2012, added subsection (i). Session Laws 2013-384, s. 3(a), effective August 23, 2013, deleted former subdivision (a)(3) and added present subdivision (a)(3); deleted subdivision (f)(2) and sub-subdivision (e)(6)d.; substituted "subsection" for "section" in subsection (b); substituted "threatened by erosion" for "imminently threatened by erosion, and nonstructural approaches to erosion control, including relocation of threatened structures, are impractical" in subdivision (e)(1); added the second and third sentences in subdivision (e)(5); rewrote subdivision (e)(6); deleted "as provided in the inlet management plan" following "measures" in sub-subdivision (e)(6)b., and following "groin" in sub-subdivision (e)(6)c.; added "the potential benefits ... infrastructure, and" in subdivision (f)(4); and in subsection (h), substituted "A local government may not use funds" for "No permit may be issued where funds are," and deleted "and would be used" following "financing mechanisms." For applicability, see editor's note. Session Laws 2015-241, s. 14.6(r), effective July 1, 2015, in subsection (g), substituted "six permits" for "four permits" and added "provided that two of the six permits may be issued only for the construction of terminal groins on the sides of New River Inlet in Onslow County and Bogue Inlet between Carteret and Onslow Counties" at the end. Session Laws 2015-241, s. 14.30(v), effective July 1, 2015, substituted "Secretary of Environmental Quality" for "Secretary of Environment and Natural Resources" in subdivision (e)(6). Session Laws 2017-10, s. 4.19, effective May 4, 2017, substituted "January 1, 2019, and every five years thereafter" for "September 1 of each year" in the beginning of subsection (i). Session Laws 2018-114, s. 15, effective June 27, 2018, rewrote subsection (c), and added subsection (c1). Session Laws 2020-3, s. 4.30(b), effective July 1, 2020, substituted "Article 7A of Chapter 159 " for "Chapter 159I" in subdivision (h)(1). Legal Periodicals. - For article, "North Carolina Oceanfront Property and Public Waters and Beaches: The Rights of Littoral Owners in the Twenty-First Century," see 83 N.C. L. Rev. 1427 (2005).

Source: official North Carolina text · Last verified 2026-08-27

Frequently Asked Questions About North Carolina § 113A-115

What does North Carolina General Statutes § 113A-115 cover?

Section 113A-115 ("1. Limitations on erosion control structures.") is part of the North Carolina General Statutes, the codified statutory law of North Carolina. It sets out the legal rule or procedure described in the text above. Statutes are amended regularly, so always verify against the official source.

How do I cite North Carolina § 113A-115?

A common citation format is "North Carolina General Statutes § 113A-115" (North Carolina). Legal writing may require the code abbreviation, section number, and year or edition. Match the style required by your court, professor, or publisher.

Is this the official text of North Carolina law?

No. This page is for research and education and may not include the most recent amendments. For official current law, check the North Carolina official source linked on this page or consult a licensed North Carolina attorney.

How does North Carolina § 113A-115 apply to my situation?

Statutes are interpreted in context, and application depends on your specific facts. Only a licensed attorney in North Carolina can advise on how this section applies to you. Contact your state or local bar association for a referral.