North Carolina § 62-133 - 8. Renewable Energy and Energy Efficiency Portfolio Standard (REPS).
Full text of North Carolina North Carolina General Statutes § 62-133 — 8. Renewable Energy and Energy Efficiency Portfolio Standard (REPS)., with citation guidance and answers to common questions.
§ 62-133. 8. Renewable Energy and Energy Efficiency Portfolio Standard (REPS).
Definitions. - As used in this section: "Combined heat and power system" means a system that uses waste heat to produce electricity or useful, measurable thermal or mechanical energy at a retail electric customer's facility. "Demand-side management" means activities, programs, or initiatives undertaken by an electric power supplier or its customers to shift the timing of electricity use from peak to nonpeak demand periods. "Demand-side management" includes, but is not limited to, load management, electric system equipment and operating controls, direct load control, and interruptible load. "Electric power supplier" means a public utility, an electric membership corporation, or a municipality that sells electric power to retail electric power customers in the State. "Electricity demand reduction" means a measurable reduction in the electricity demand of a retail electric customer that is voluntary, under the real-time control of both the electric power supplier and the retail electric customer, and measured in real time, using two-way communications devices that communicate on the basis of standards. "Energy efficiency measure" means an equipment, physical, or program change implemented after January 1, 2007, that results in less energy used to perform the same function. "Energy efficiency measure" includes, but is not limited to, energy produced from a combined heat and power system that uses nonrenewable energy resources. "Energy efficiency measure" does not include demand-side management. "New renewable energy facility" means a renewable energy facility that either: Was placed into service on or after January 1, 2007. Delivers or has delivered electric power to an electric power supplier pursuant to a contract with NC GreenPower Corporation that was entered into prior to January 1, 2007. Is a hydroelectric power facility with a generation capacity of 10 megawatts or less that delivers electric power to an electric power supplier. "Renewable energy certificate" means a tradable instrument that is equal to one megawatt hour of electricity or equivalent energy supplied by a renewable energy facility, new renewable energy facility, or reduced by implementation of an energy efficiency measure that is used to track and verify compliance with the requirements of this section as determined by the Commission. A "renewable energy certificate" does not include the related emission reductions, including, but not limited to, reductions of sulfur dioxide, oxides of nitrogen, mercury, or carbon dioxide. "Renewable energy facility" means a facility, other than a hydroelectric power facility with a generation capacity of more than 10 megawatts, that either: Generates electric power by the use of a renewable energy resource. Generates useful, measurable combined heat and power derived from a renewable energy resource. Is a solar thermal energy facility. "Renewable energy resource" means a solar electric, solar thermal, wind, hydropower, geothermal, or ocean current or wave energy resource; a biomass resource, including agricultural waste, animal waste, wood waste, spent pulping liquors, combustible residues, combustible liquids, combustible gases, energy crops, or landfill methane; waste heat derived from a renewable energy resource and used to produce electricity or useful, measurable thermal energy at a retail electric customer's facility; or hydrogen derived from a renewable energy resource. "Renewable energy resource" does not include peat, a fossil fuel, or nuclear energy resource. Renewable Energy and Energy Efficiency Standards (REPS) for Electric Public Utilities. - Each electric public utility in the State shall be subject to a Renewable Energy and Energy Efficiency Portfolio Standard (REPS) according to the following schedule: An electric public utility may meet the requirements of this section by any one or more of the following: Generate electric power at a new renewable energy facility. Use a renewable energy resource to generate electric power at a generating facility other than the generation of electric power from waste heat derived from the combustion of fossil fuel. Reduce energy consumption through the implementation of an energy efficiency measure; provided, however, an electric public utility subject to the provisions of this subsection may meet up to twenty-five percent (25%) of the requirements of this section through savings due to implementation of energy efficiency measures. Beginning in calendar year 2021 and each year thereafter, an electric public utility may meet up to forty percent (40%) of the requirements of this section through savings due to implementation of energy efficiency measures. Purchase electric power from a new renewable energy facility. Electric power purchased from a new renewable energy facility located outside the geographic boundaries of the State shall meet the requirements of this section if the electric power is delivered to a public utility that provides electric power to retail electric customers in the State; provided, however, the electric public utility shall not sell the renewable energy certificates created pursuant to this paragraph to another electric public utility. Purchase renewable energy certificates derived from in-State or out-of-state new renewable energy facilities. Certificates derived from out-of-state new renewable energy facilities shall not be used to meet more than twenty-five percent (25%) of the requirements of this section, provided that this limitation shall not apply to an electric public utility with less than 150,000 North Carolina retail jurisdictional customers as of December 31, 2006. Use electric power that is supplied by a new renewable energy facility or saved due to the implementation of an energy efficiency measure that exceeds the requirements of this section for any calendar year as a credit towards the requirements of this section in the following calendar year or sell the associated renewable energy certificates. Electricity demand reduction. Renewable Energy and Energy Efficiency Standards (REPS) for Electric Membership Corporations and Municipalities. - Each electric membership corporation or municipality that sells electric power to retail electric power customers in the State shall be subject to a Renewable Energy and Energy Efficiency Portfolio Standard (REPS) according to the following schedule: An electric membership corporation or municipality may meet the requirements of this section by any one or more of the following: Generate electric power at a new renewable energy facility. Reduce energy consumption through the implementation of demand-side management or energy efficiency measures. Purchase electric power from a renewable energy facility or a hydroelectric power facility, provided that no more than thirty percent (30%) of the requirements of this section may be met with hydroelectric power, including allocations made by the Southeastern Power Administration. Purchase renewable energy certificates derived from in-State or out-of-state renewable energy facilities. An electric power supplier subject to the requirements of this subsection may use certificates derived from out-of-state renewable energy facilities to meet no more than twenty-five percent (25%) of the requirements of this section. Acquire all or part of its electric power through a wholesale purchase power agreement with a wholesale supplier of electric power whose portfolio of supply and demand options meets the requirements of this section. Use electric power that is supplied by a new renewable energy facility or saved due to the implementation of demand-side management or energy efficiency measures that exceeds the requirements of this section for any calendar year as a credit towards the requirements of this section in the following calendar year or sell the associated renewable energy certificates. Electricity demand reduction. Compliance With REPS Requirement Through Use of Solar Energy Resources. - For calendar year 2018 and for each calendar year thereafter, at least two-tenths of one percent (0.2%) of the total electric power in kilowatt hours sold to retail electric customers in the State, or an equivalent amount of energy, shall be supplied by a combination of new solar electric facilities and new metered solar thermal energy facilities that use one or more of the following applications: solar hot water, solar absorption cooling, solar dehumidification, solar thermally driven refrigeration, and solar industrial process heat. The terms of any contract entered into between an electric power supplier and a new solar electric facility or new metered solar thermal energy facility shall be of sufficient length to stimulate development of solar energy; provided, the Commission shall develop a procedure to determine if an electric power supplier is in compliance with the provisions of this subsection if a new solar electric facility or a new metered solar thermal energy facility fails to meet the terms of its contract with the electric power supplier. As used in this subsection, "new" means a facility that was first placed into service on or after January 1, 2007. The electric power suppliers shall comply with the requirements of this subsection according to the following schedule: Compliance With REPS Requirement Through Use of Swine Waste Resources. - For calendar year 2018 and for each calendar year thereafter, at least two-tenths of one percent (0.2%) of the total electric power in kilowatt hours sold to retail electric customers in the State shall be supplied, or contracted for supply in each year, by swine waste. The electric power suppliers, in the aggregate, shall comply with the requirements of this subsection according to the following schedule: Compliance With REPS Requirement Through Use of Poultry Waste Resources. - For calendar year 2014 and for each calendar year thereafter, at least 900,000 megawatt hours of the total electric power sold to retail electric customers in the State or an equivalent amount of energy shall be supplied, or contracted for supply in each year, by poultry waste combined with wood shavings, straw, rice hulls, or other bedding material. The electric power suppliers, in the aggregate, shall comply with the requirements of this subsection according to the following schedule: Control of Emissions. - As used in this subsection, Best Available Control Technology (BACT) means an emissions limitation based on the maximum degree a reduction in the emission of air pollutants that is achievable for a facility, taking into account energy, environmental, and economic impacts and other costs. A biomass combustion process at any new renewable energy facility that delivers electric power to an electric power supplier shall meet BACT. The Environmental Management Commission shall determine on a case-by-case basis the BACT for a facility that would not otherwise be required to comply with BACT pursuant to the Prevention of Significant Deterioration (PSD) emissions program. The Environmental Management Commission may adopt rules to implement this subsection. In adopting rules, the Environmental Management Commission shall take into account cumulative and secondary impacts associated with the concentration of biomass facilities in close proximity to one another. In adopting rules the Environmental Management Commission shall provide for the manner in which a facility that would not otherwise be required to comply with BACT pursuant to the PSD emissions programs shall meet the BACT requirement. This subsection shall not apply to a facility that qualifies as a new renewable energy facility under sub-subdivision b. of subdivision (5) of subsection (a) of this section. Cost Recovery and Customer Charges. - For the purposes of this subsection, the term "incremental costs" means all reasonable and prudent costs incurred by an electric power supplier to: Comply with the requirements of subsections (b), (c), (d), (e), and (f) of this section that are in excess of the electric power supplier's avoided costs other than those costs recovered pursuant to G.S. 62-133.9. Fund research that encourages the development of renewable energy, energy efficiency, or improved air quality, provided those costs do not exceed one million dollars ($1,000,000) per year. Comply with any federal mandate that is similar to the requirements of subsections (b), (c), (d), (e), and (f) of this section that exceed the costs that the electric power supplier would have incurred under those subsections in the absence of the federal mandate. Provide incentives to customers, including program costs, incurred pursuant to G.S. 62-155(f). All reasonable and prudent costs incurred by an electric power supplier to comply with any federal mandate that is similar to the requirements of subsections (b), (c), (d), (e), and (f) of this section, including, but not limited to, the avoided costs associated with a federal mandate that exceeds the avoided costs that the electric power supplier would have incurred pursuant to subsections (b), (c), (d), (e), and (f) of this section in the absence of the federal mandate, shall be recovered by the electric power supplier in an annual rider charge assessed in accordance with the schedule set out in subdivision (4) of this subsection increased by the Commission on a pro rata basis to allow for full and complete recovery of all reasonable and prudent costs incurred to comply with the federal mandate. Except as provided in subdivision (2) of this subsection, the total annual incremental cost to be incurred by an electric power supplier and recovered from the electric power supplier's retail customers shall not exceed an amount equal to the per-account annual charges set out in subdivision (4) of this subsection applied to the electric power supplier's total number of customer accounts determined as of December 31 of the previous calendar year. An electric power supplier shall be conclusively deemed to be in compliance with the requirements of subsections (b), (c), (d), (e), and (f) of this section if the electric power supplier's total annual incremental costs incurred equals an amount equal to the per-account annual charges set out in subdivision (4) of this subsection applied to the electric power supplier's total number of customer accounts determined as of December 31 of the previous calendar year. The total annual incremental cost recoverable by an electric power supplier from an individual customer shall not exceed the per-account charges set out in subdivision (4) of this subsection except as these charges may be adjusted in subdivision (2) of this subsection. An electric power supplier shall be allowed to recover the incremental costs incurred to comply with the requirements of subsections (b), (c), (d), (e), and (f) of this section and fund research as provided in subdivision (1) of this subsection through an annual rider not to exceed the following per-account annual charges: The Commission shall adopt rules to establish a procedure for the annual assessment of the per-account charges set out in this subsection to an electric public utility's customers to allow for timely recovery of all reasonable and prudent costs of compliance with the requirements of subsections (b), (c), (d), (e), and (f) of this section and to fund research as provided in subdivision (1) of this subsection. The Commission shall ensure that the costs to be recovered from individual customers on a per-account basis pursuant to subdivisions (2) and (3) of this subsection are in the same proportion as the per-account annual charges for each customer class set out in subdivision (4) of this subsection. Adoption of Rules. - The Commission shall adopt rules to implement the provisions of this section. In developing rules, the Commission shall: Provide for the monitoring of compliance with and enforcement of the requirements of this section. Include a procedure to modify or delay the provisions of subsections (b), (c), (d), (e), and (f) of this section in whole or in part if the Commission determines that it is in the public interest to do so. The procedure adopted pursuant to this subdivision shall include a requirement that the electric power supplier demonstrate that it made a reasonable effort to meet the requirements set out in this section. Ensure that energy credited toward compliance with the provisions of this section not be credited toward any other purpose, including another renewable energy portfolio standard or voluntary renewable energy purchase program in this State or any other state. Establish standards for interconnection of renewable energy facilities and other nonutility-owned generation with a generation capacity of 10 megawatts or less to an electric public utility's distribution system; provided, however, that the Commission shall adopt, if appropriate, federal interconnection standards. The standards adopted pursuant to this subdivision shall include an expedited review process for swine and poultry waste to energy projects of two megawatts (MW) or less and other measures necessary and appropriate to achieve the objectives of subsections (e) and (f) of this section. Ensure that the owner and operator of each renewable energy facility that delivers electric power to an electric power supplier is in substantial compliance with all federal and state laws, regulations, and rules for the protection of the environment and conservation of natural resources. Consider whether it is in the public interest to adopt rules for electric public utilities for net metering of renewable energy facilities with a generation capacity of one megawatt or less. Develop procedures to track and account for renewable energy certificates, including ownership of renewable energy certificates that are derived from a customer owned renewable energy facility as a result of any action by a customer of an electric power supplier that is independent of a program sponsored by the electric power supplier. Repealed by Session Laws 2021-23, s. 16, effective May 17, 2021. Tracking of Renewable Energy Certificates. - No later than July 1, 2010, the Commission shall develop, implement, and maintain an Internet Web site for the online tracking of renewable energy certificates in order to verify the compliance of electric power suppliers with the REPS requirements of this section and to facilitate the establishment of a market for the purchase and sale of renewable energy certificates. The owner, including an electric power supplier, of each renewable energy facility or new renewable energy facility, whether or not required to obtain a certificate of public convenience and necessity pursuant to G.S. 62-110.1, that intends for renewable energy certificates it earns to be eligible for use by an electric power supplier to comply with G.S. 62-133.8 shall register the facility with the Commission. Such an owner shall file a registration statement in the form prescribed by the Commission and remit to the Commission the fee required pursuant to G.S. 62-300(a)(16). Calendar Year REPS Requirement 2012 3% of 2011 North Carolina retail sales 2015 6% of 2014 North Carolina retail sales 2018 10% of 2017 North Carolina retail sales 2021 and thereafter 12.5% of 2020 North Carolina retail sales 2012 3% of 2011 North Carolina retail sales 2015 6% of 2014 North Carolina retail sales 2018 and thereafter 10% of 2017 North Carolina retail sales 2010 0.02% 2012 0.07% 2015 0.14% 2018 0.20% 2012 0.07% 2015 0.14% 2018 0.20% 2012 170,000 megawatt hours 2013 700,000 megawatt hours 2014 900,000 megawatt hours Residential per account $10.00 $12.00 $27.00 Commercial per account $50.00 $150.00 $150.00 Industrial per account $500.00 $1,000.00 $1,000.00 History (2007-397, s. 2(a); 2009-475, s. 14(a); 2011-55, ss. 1, 2, 3; 2011-291, s. 2.13; 2011-309, s. 2; 2011-394, s. 1; 2015-241, s. 14.30(u); 2017-57, s. 14.1(p); 2017-192, ss. 7, 8(b), 10(a), 5.1(a); 2021-23, s. 16.) Editor's Note. - Session Laws 2007-397, s. 2(a), enacted this section as G.S. 62-133.7. It has been renumbered as this section at the direction of the Revisor of Statutes. Session Laws 2007-397, s. 3, provides: "If the federal government imposes requirements similar to those set out in G.S. 62-133.8 on electric power suppliers in the State, the Utilities Commission shall determine the applicability of federal and State requirements so as to apply the more stringent requirements except to the extent that State requirements may be specifically preempted by federal law. The Commission shall adopt rules to establish a procedure as an alternative to the procedure set out in G.S. 62-133 to annually adjust the rates of electric public utilities to allow timely recovery of all reasonable costs of compliance with the federal and State requirements pursuant to G.S. 62-133.8(h), as enacted by Section 2 of this act. In adopting rules to establish the procedure, the Commission shall incorporate the provisions of this act in accordance with this section and the public interest." Session Laws 2009-451, s. 9.14(d), provides: "The energy generated by the wind turbines constructed pursuant to this act shall be allocated between The University of North Carolina and a third party with which The University enters into a contract pursuant to subsection (a) of this section. The allocation shall be determined by written agreement between the parties. For the purposes of this demonstration project, for every 1 megawatt-hour (MWh) generated by the project, The University shall receive one renewable energy certificate (REC), including all environmental attributes, benefits, and credits. The third party described in subsection (a) of this section shall be deemed to have received 3.0 RECs for every 1 MWh of electricity generated by the project solely in order to meet the obligations of the NC Renewable Energy and Energy Efficiency Portfolio Standard (REPS) of G.S. 62-133.8(b) and shall not be subject to the provisions of G.S. 62.133.8(h)." Session Laws 2009-451, s. 1.2, provides: "This act shall be known as the 'Current Operations and Capital Improvements Appropriations Act of 2009'." Session Laws 2009-451, s. 28.3, provides: "Except for statutory changes or other provisions that clearly indicate an intention to have effects beyond the 2009-2011 fiscal biennium, the textual provisions of this act apply only to funds appropriated for, and activities occurring during, the 2009-2011 fiscal biennium." Session Laws 2009-451, s. 28.5 is a severability clause. Session Laws 2009-475, s. 14(b) and (c), provides: "(b) The North Carolina Utilities Commission shall use available funds for the 2009-2010 fiscal year to implement this section. "(c) The Energy Policy Council and the North Carolina Utilities Commission shall jointly study and design an online renewable energy certificates trading exchange to facilitate the establishment of a market for purchase and sale of renewable energy certificates. The study shall explore how to implement an exchange that will not require appropriated funds from the State and shall examine all costs to the consumer. The Energy Policy Council and the North Carolina Utilities Commission shall report their findings and recommendations to the General Assembly by April 1, 2010." Session Laws 2009-475, s. 15, provides: "The General Assembly finds that it is in the public interest of the State of North Carolina to ensure expeditious awards of ARRA funds to maximize the economic recovery impact of the ARRA. It is the policy of the State to provide fair regulation, oversight, and transparency for the use of ARRA funds and to quickly and efficiently complete the awards of grants and contracts under the ARRA. It is also the policy of this State that, due to the historic level of federal and State oversight of ARRA grant and contract awards, restraint should be exercised in the granting of legal and injunctive relief that might forestall awards to programs and contractors." Session Laws 2010-195, ss. 1-4, as amended by 2011-279, s. 1, effective June 23, 2011, provide: "Section 1. Legislative findings. - The General Assembly makes the following findings regarding the need for cleanfields renewable energy demonstration parks: "(1) Economic development in the State will be served by providing an opportunity to convert former manufacturing sites into cleanfields renewable energy demonstration parks, thereby providing employment opportunities for the residents of North Carolina. "(2) The health and safety of the citizens of North Carolina will be served through the assessment and remediation of environmental conditions at former manufacturing facilities. "(3) The public interest of the State will be served by diversifying the resources used to reliably meet the energy needs of consumers in the State, providing greater energy security through the use of indigenous energy resources available within the State, and encouraging private investment in renewable energy and energy efficiency. "(4) The public interest of the State will be served by encouraging former operators of manufacturing facilities to transfer ownership in property, making it possible for new operators to restart production at such facilities. "(5) The State and the public will directly benefit from the innovative approach utilized in a cleanfields renewable energy demonstration park to resolving pressing societal and environmental issues facing the State and its citizens. "(6) The public interest of the State will be served by the innovative nature of a cleanfields renewable energy demonstration park as a model for future projects and for its ability to provide information on the risks and complexity associated with the development of renewable energy projects. "Section 2. Criteria for designation. - A parcel or tract of land, or any combination of contiguous parcels or tracts of land, that meet all of the following criteria may be designated as a cleanfields renewable energy demonstration park: "(1) The park consists of at least 250 acres of contiguous property. "(2) All of the real property comprising the park is contiguous to a body of water. "(3) The property within the park is or may be subject to remediation under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980, as amended (42 U.S.C. § 9601, et seq.), except for a site listed on the National Priorities List pursuant to 42 U.S.C. § 9605. "(4) The park contains a manufacturing facility that is idle, underutilized, or curtailed and that at one time employed at least 250 people. "(5) The owners of the park plan to attract at least 250 new jobs to the site. "(6) The owners of the park have entered into a brownfields agreement with the Department of Environment and Natural Resources pursuant to G.S. 130A-310.32 and have provided satisfactory financial assurance for the brownfields agreement. "(7) The creation of the park is for the purpose of featuring clean-energy facilities, laboratories, and companies, thereby spurring economic growth by attracting renewable energy and alternative fuel industries. "(8) The development plan for the park must include at least three renewable energy or alternative fuel facilities. "(9) The development plan for the park must include a biomass renewable energy facility that utilizes refuse derived fuel, including yard waste, wood waste, and waste generated from construction and demolition, but not including wood directly derived from whole trees, as the primary source for generating energy. The refuse derived fuel shall undergo an enhanced recycling process before being utilized by the biomass renewable energy facility. "(10) The initial biomass renewable energy facility will not be a major source, as that term is defined in 40 C.F.R. § 70.2 (July 1, 2009 edition), for air quality purposes. The biomass renewable energy facility will remain in compliance with all applicable State and federal emissions requirements throughout its operating life. "Section 3. Certification. - The owner of a parcel or tract of land that seeks to establish a cleanfields renewable energy demonstration park shall submit to the Secretary of State an application for designation. The Secretary shall examine the application and may request any additional information from the owner of the parcel or tract of land or the Department of Environment and Natural Resources needed to verify that the project meets all of the criteria for designation. The Secretary may rely on certifications provided by the owner or the Department of Environment and Natural Resources that the criteria are met. If the Secretary determines that the project meets all of the criteria, the Secretary shall make and issue a certificate designating the parcel or tract of land as a cleanfields renewable energy demonstration park to the owner and shall file and record the application and certificate in an appropriate book of record. The parcel or tract of land shall be designated as a cleanfields renewable energy demonstration park on the date the certificate is filed and recorded. "Section 4. Renewable energy generation. - The definitions in G.S. 62-133.8 apply to this act. If the Utilities Commission determines that a biomass renewable energy facility located in the cleanfields renewable energy demonstration park is a new renewable energy facility, the Commission shall assign triple credit to any electric power or renewable energy certificates generated from renewable energy resources at the biomass renewable energy facility that are purchased by an electric power supplier for the purposes of compliance with G.S. 62-133.8. The additional credits assigned to the first 10 megawatts of biomass renewable energy facility generation capacity shall be eligible for use to meet the requirements of G.S. 62-133.8(f). The additional credits assigned to the first 10 megawatts of biomass renewable energy facility generation capacity shall first be used to satisfy the requirements of G.S. 62-133.8(f). Only when the requirements of G.S. 62-133.8(f) are met, shall the additional credits assigned to the first 10 megawatts of biomass renewable energy facility generation capacity be utilized to comply with G.S. 62-133.8(b) and (c). The triple credit shall apply only to the first 20 megawatts of biomass renewable energy facility generation capacity located in all cleanfields renewable energy demonstration parks in the State." Session Laws 2011-309, s. 1, provides: "Legislative Findings. - The General Assembly makes the following findings regarding the need to allow renewable energy certificates (RECs) derived from the thermal energy output of combined heat and power facilities that use poultry waste as a fuel to meet the requirements of the poultry waste set-aside under G.S. 62-133.8(f) (Compliance With REPS Requirements Through the Use of Poultry Waste Resources): "(1) The electric power suppliers have experienced considerable difficulty in procuring sufficient electricity derived from the use of poultry waste at a reasonable cost to meet the especially restrictive language of the poultry waste set-aside. "(2) The public interest of the State will be served by providing a cost-effective option for the electric power suppliers to use in order to comply with the poultry waste set-aside. "(3) The State and the public will benefit directly from reduced process steam costs to North Carolina businesses, which will help North Carolina businesses remain competitive and viable. "(4) The State and the public will benefit directly from diversifying the State's viable generation resource options, which utilize indigenous North Carolina resources to foster development of renewable projects in the State and encourage investment in new renewable projects. "(5) The health and safety of the citizens of the State will be served through improving air quality and water quality through the controlled destruction of methane, the capture of organic residuals, and addressing the very important environmental concern involving the current disposal practice of land application of poultry waste, which poses an ever increasing threat of pollution and contamination of the waters of the State." Session Laws 2017-57, s. 1.1, provides: "This act shall be known as the 'Current Operations Appropriations Act of 2017.'" Session Laws 2017-57, s. 39.6, is a severability clause. Session Laws 2017-192, s. 5.1(b) made the amendment to subdivision (h)(4) by Session Laws 2017-192, s. 5.1(a), effective July 1, 2017, and applicable to cost-recovery proceedings initiated on or after that date. Session Laws 2017-192, s. 5.2, provides: "2. All reasonable and prudent incremental costs incurred by an electric power supplier prior to July 1, 2017, to comply with any requirement repealed or amended by this act may be recovered as provided in G.S. 62-133.8(h), as amended by this act. For the purposes of cost-recovery under this act, reasonable and prudent incremental costs shall include all of the following: "(1) Costs under purchase contracts for renewable energy entered into prior to July 1, 2017, for the purpose of complying with the renewable energy portfolio standards requirements amended by this act. "(2) The costs of renewable energy facilities built or acquired by a public utility for which a certificate of public convenience and necessity has been issued by the Commission prior to July 1, 2017." Session Laws 2017-192, s. 14(a), contains a severability clause. Effect of Amendments. - Session Laws 2009-475, s. 14(a), effective February 17, 2009, added subsection (k). Session Laws 2011-55, ss. 1 through 3, effective April 28, 2011, added subdivisions (a)(3a), (b)(2)g., and (c)(2)g. Session Laws 2011-291, s. 2.13, effective June 24, 2011, substituted "Joint Legislative Commission on Governmental Operations" for "Joint Legislative Utility Review Committee" in the first sentence of subsection (j). Session Laws 2011-309, s. 2, effective June 27, 2011, inserted "or an equivalent amount of energy" in the first sentence of subsection (f). Session Laws 2011-394, s. 1, effective July 1, 2011, added the last sentence in subsection (g). Session Laws 2015-241, s. 14.30(u), effective July 1, 2015, substituted "Department of Environmental Quality" for "Department of Environment and Natural Resources" in subsection (j). Session Laws 2017-57, s. 14.1(p), effective July 1, 2017, substituted "Joint Legislative Oversight Committee on Agriculture and Natural and Economic Resources, the Senate Appropriations Committee on Agriculture, Natural, and Economic Resources, and the chairs of the House of Representatives Appropriations Committee on Agriculture and Natural and Economic Resources" for "Joint Legislative Commission on Governmental Operations" in subsection (j). Session Laws 2017-192, s. 5.1(a), substituted "$27.00" for "$34.00" in the "2015 and thereafter" column of the table in subdivision (h)(4); added the last sentence in subdivision (i)(4); added subdivision (h)(1)d; and added subsection ( l ). For effective date and applicability, see editor's note. Session Laws 2021-23, s. 16, effective May 17, 2021, deleted subsection (j). Legal Periodicals. - For article, "Wind Over North Carolina Waters: The State's Preparedness to Address Offshore and Coastal Water-Based Wind Energy Projects," see 87 N.C.L. Rev. 1819 (2009). For article, "Ripening on the Vine: North Carolina's Renewable Energy and Energy Efficiency Portfolio Standard Should Be Left Unchanged Ahead of 2012 Compliance Deadline," see 34 N.C. Cent. L. Rev. 111 (2012). For article, "Solving the Multimillion Dollar Constitutional Puzzle Surrounding State 'Sustainable' Energy Policy," see 49 Wake Forest L. Rev. 121 (2014).
Source: official North Carolina text · Last verified 2026-08-27
Frequently Asked Questions About North Carolina § 62-133
What does North Carolina General Statutes § 62-133 cover?
Section 62-133 ("8. Renewable Energy and Energy Efficiency Portfolio Standard (REPS).") is part of the North Carolina General Statutes, the codified statutory law of North Carolina. It sets out the legal rule or procedure described in the text above. Statutes are amended regularly, so always verify against the official source.
How do I cite North Carolina § 62-133?
A common citation format is "North Carolina General Statutes § 62-133" (North Carolina). Legal writing may require the code abbreviation, section number, and year or edition. Match the style required by your court, professor, or publisher.
Is this the official text of North Carolina law?
No. This page is for research and education and may not include the most recent amendments. For official current law, check the North Carolina official source linked on this page or consult a licensed North Carolina attorney.
How does North Carolina § 62-133 apply to my situation?
Statutes are interpreted in context, and application depends on your specific facts. Only a licensed attorney in North Carolina can advise on how this section applies to you. Contact your state or local bar association for a referral.
Sources & Verification
Not legal advice. Verify against the official source and consult a licensed attorney in North Carolina.