§ 60-13-47. Trade bureaus; connection to installation

A. Except where work is done under an annual permit, no public utility shall make

a connection from a supply of water or gas to an installation for which a permit is

required, or which has been disconnected or ordered to be disconnected by the trade

bureau having jurisdiction, without the authorization of the trade bureau having jurisdiction. B. The public utility may make a connection from a supply of water or gas to an installation

under the following circumstances: (1) if within seven days after notification to the appropriate trade bureau of the

completion of any work or installation the bureau has failed to approve or disapprove

the connection; or (2) if an installation or work is not located in any territory where there is an authorized

inspector; provided, however, before any such connection is made by the public utility,

the public utility must have received a written statement from the licensee declaring

that the installation or work conforms with the provisions of the Construction Industries

Licensing Act and the orders, rules and regulations, codes and minimum standards made

pursuant to that act. The public utility shall immediately report to the proper trade bureau the receipt

and contents of the statement. If it is discovered by the trade bureau that the declaration made in the statement

is false, the trade bureau shall order the licensee making the statement to rectify

the defects within five days after receipt of the written notice thereof from the

bureau. C. No public or municipally owned electric utility shall make a connection from a

supply of electricity for which a permit is required without the approval of the electrical

bureau or its authorized representative. In the event of an emergency, the electrical contractor shall issue a prefinal permit

to the serving utility authorizing the service to be reconnected. The electrical contractor shall report the emergency on the next working day to

the electrical bureau or its authorized representative for inspection.

Source: official New Mexico text · Last verified 2026-08-27

Frequently Asked Questions About New Mexico § 60-13-47

What does New Mexico Statutes Annotated § 60-13-47 cover?

Section 60-13-47 ("Trade bureaus; connection to installation") is part of the New Mexico Statutes Annotated, the codified statutory law of New Mexico. It sets out the legal rule or procedure described in the text above. Statutes are amended regularly, so always verify against the official source.

How do I cite New Mexico § 60-13-47?

A common citation format is "New Mexico Statutes Annotated § 60-13-47" (New Mexico). Legal writing may require the code abbreviation, section number, and year or edition. Match the style required by your court, professor, or publisher.

Is this the official text of New Mexico law?

No. This page is for research and education and may not include the most recent amendments. For official current law, check the New Mexico official source linked on this page or consult a licensed New Mexico attorney.

How does New Mexico § 60-13-47 apply to my situation?

Statutes are interpreted in context, and application depends on your specific facts. Only a licensed attorney in New Mexico can advise on how this section applies to you. Contact your state or local bar association for a referral.

Sources & Verification

Not legal advice. Verify against the official source and consult a licensed attorney in New Mexico.