Nevada § 408.3886 - Requests for final proposals and best and final offers: Selection or rejection of proposal or offer; contents of contract between Department and design-build team; applicability of prevailing wage requirements to projects; duties of design-build team
Full text of Nevada Nevada Revised Statutes § 408.3886 — Requests for final proposals and best and final offers: Selection or rejection of proposal or offer; contents of contract between Department and design-build team; applicability of prevailing wage requirements to projects; duties of design-build team, with citation guidance and answers to common questions.
§ 408.3886. Requests for final proposals and best and final offers: Selection or rejection of proposal or offer; contents of contract between Department and design-build team; applicability of prevailing wage requirements to projects; duties of design-build team
1. After selecting the finalists pursuant to NRS 408.3885 , the Department shall provide to each finalist a request for final proposals for
the project. The request for final proposals must: (a) Set forth the factors that the Department will use to select a design-build team
to design and construct the project, including the relative weight to be assigned
to each factor; and (b) Set forth the date by which final proposals must be submitted to the Department. 2. Except as otherwise provided in this subsection, in assigning the relative weight
to each factor for selecting a design-build team pursuant to subsection 1, the Department
shall assign, without limitation, a relative weight of 5 percent to the design-build
team's possession of both a certificate of eligibility to receive a preference in
bidding on public works by the prime contractor on the design-build team, if the design-build
team submits a signed affidavit that meets the requirements of subsection 1 of NRS 338.0117 , and a certificate of eligibility to receive a preference when competing for public
works by all persons who hold a certificate of registration to practice architecture
or a license as a professional engineer on the design-build team, and a relative weight
of at least 30 percent for the proposed cost of design and construction of the project. If any federal statute or regulation precludes the granting of federal assistance
or reduces the amount of that assistance for a particular project because of the provisions
of this subsection relating to a preference in bidding on public works or a preference
when competing for public works, those provisions of this subsection do not apply
insofar as their application would preclude or reduce federal assistance for that
project. 3. A final proposal submitted by a design-build team pursuant to this section must
be prepared thoroughly, be responsive to the criteria that the Department will use
to select a design-build team to design and construct the project described in subsection
1 and comply with the provisions of NRS 338.141 . 4. After receiving the final proposals for the project, the Department shall: (a) Select the most cost-effective and responsive final proposal, using the criteria
set forth pursuant to subsections 1 and 2; (b) Reject all the final proposals; or (c) Request best and final offers from all finalists in accordance with subsection
5. 5. If the Department determines that no final proposal received is cost-effective
or responsive and the Department further determines that requesting best and final
offers pursuant to this subsection will likely result in the submission of a satisfactory
offer, the Department may prepare and provide to each finalist a request for best
and final offers for the project. In conjunction with preparing a request for best and final offers pursuant to this
subsection, the Department may alter the scope of the project, revise the estimates
of the costs of designing and constructing the project, and revise the selection factors
and relative weights described in paragraph (a) of subsection 1. A request for best and final offers prepared pursuant to this subsection must set
forth the date by which best and final offers must be submitted to the Department. After receiving the best and final offers, the Department shall: (a) Select the most cost-effective and responsive best and final offer, using the
criteria set forth in the request for best and final offers; or (b) Reject all the best and final offers. 6. If the Department selects a final proposal pursuant to paragraph (a) of subsection
4 or selects a best and final offer pursuant to paragraph (a) of subsection 5, the
Department shall hold a public meeting to: (a) Review and ratify the selection. (b) Partially reimburse the unsuccessful finalists if partial reimbursement was provided
for in the request for preliminary proposals pursuant to paragraph (f) of subsection
3 of NRS 408.3883 . The amount of reimbursement must not exceed, for each unsuccessful finalist, 3 percent
of the total amount to be paid to the design-build team as set forth in the design-build
contract. (c) Make available to the public a summary setting forth the factors used by the Department
to select the successful design-build team and the ranking of the design-build teams
who submitted final proposals and, if applicable, best and final offers. The Department shall not release to a third party, or otherwise make public, financial
or proprietary information submitted by a design-build team. 7. A contract awarded pursuant to this section: (a) Must comply with the provisions of NRS 338.013 to 338.090 , inclusive; and (b) Must specify: (1) An amount that is the maximum amount that the Department will pay for the performance
of all the work required by the contract, excluding any amount related to costs that
may be incurred as a result of unexpected conditions or occurrences as authorized
by the contract; (2) An amount that is the maximum amount that the Department will pay for the performance
of the professional services required by the contract; and (3) A date by which performance of the work required by the contract must be completed. 8. The Department, the design-build team, any contractor who is awarded a contract
or enters into an agreement to perform work on the project, and any subcontractor
who performs work on the project shall comply with the provisions of NRS 338.013 to 338.090 , inclusive, in the same manner as if the Department had undertaken the project or
had awarded the contract. 9. A design-build team to whom a contract is awarded pursuant to this section shall: (a) Assume overall responsibility for ensuring that the design and construction of
the project is completed in a satisfactory manner; and (b) Use the workforce of the prime contractor on the design-build team to construct
at least 15 percent of the project.
Source: official Nevada text · Last verified 2026-08-27
Frequently Asked Questions About Nevada § 408.3886
What does Nevada Revised Statutes § 408.3886 cover?
Section 408.3886 ("Requests for final proposals and best and final offers: Selection or rejection of proposal or offer; contents of contract between Department and design-build team; applicability of prevailing wage requirements to projects; duties of design-build team") is part of the Nevada Revised Statutes, the codified statutory law of Nevada. It sets out the legal rule or procedure described in the text above. Statutes are amended regularly, so always verify against the official source.
How do I cite Nevada § 408.3886?
A common citation format is "Nevada Revised Statutes § 408.3886" (Nevada). Legal writing may require the code abbreviation, section number, and year or edition. Match the style required by your court, professor, or publisher.
Is this the official text of Nevada law?
No. This page is for research and education and may not include the most recent amendments. For official current law, check the Nevada official source linked on this page or consult a licensed Nevada attorney.
How does Nevada § 408.3886 apply to my situation?
Statutes are interpreted in context, and application depends on your specific facts. Only a licensed attorney in Nevada can advise on how this section applies to you. Contact your state or local bar association for a referral.
Sources & Verification
Not legal advice. Verify against the official source and consult a licensed attorney in Nevada.