Nevada § 278.26503 - Establishment of procedures for issuance of permit or special use permit for construction of project

Full text of Nevada Nevada Revised Statutes § 278.26503 — Establishment of procedures for issuance of permit or special use permit for construction of project, with citation guidance and answers to common questions.

§ 278.26503. Establishment of procedures for issuance of permit or special use permit for construction of project

Each governing body: 1. Shall establish a process for the issuance of a permit for the construction of

an aboveground utility project which is located in a corridor for the construction

of aboveground utility projects identified in the master plan adopted by the planning

commission or governing body. 2. Shall establish a process for the issuance of a special use permit for the construction

of an aboveground utility project which is not located in a corridor for the construction

of aboveground utility projects identified in the master plan adopted by the planning

commission or governing body. The process adopted by the governing body must include, without limitation, provisions: (a) Requiring the planning commission or the governing body to review each completed

application at a public hearing; (b) Requiring the applicant to provide proof satisfactory to the planning commission

or the governing body that the construction of the aboveground utility project does

not conflict with any existing or planned infrastructure or other utility projects;

and (c) Authorizing the planning commission or the governing body to issue or deny the

issuance of a special use permit for the construction of an aboveground utility project

based on the proximity of the proposed site of the aboveground utility project to

any school, hospital or urban residential area with a dwelling density greater than

2 units per gross acre. 3. Shall establish a process for the issuance of a special use permit for the construction

of a renewable energy generation project with a nameplate capacity of 10 megawatts

or more which must include, without limitation, provisions: (a) Establishing the required contents of an application; (b) Establishing the criteria by which the planning commission or the governing body

will evaluate an application; and (c) Requiring the planning commission or the governing body to review each completed

application at a public hearing not later than 65 days after receiving the complete

application. 4. May establish an expedited process for the issuance of a permit or special use

permit described in subsections 1, 2 and 3 if the governing body determines that: (a) The project will be located in an isolated or rural area; and (b) There is minimal risk of disturbance to residents as a result of the construction

of the project.

Source: official Nevada text · Last verified 2026-08-27

Frequently Asked Questions About Nevada § 278.26503

What does Nevada Revised Statutes § 278.26503 cover?

Section 278.26503 ("Establishment of procedures for issuance of permit or special use permit for construction of project") is part of the Nevada Revised Statutes, the codified statutory law of Nevada. It sets out the legal rule or procedure described in the text above. Statutes are amended regularly, so always verify against the official source.

How do I cite Nevada § 278.26503?

A common citation format is "Nevada Revised Statutes § 278.26503" (Nevada). Legal writing may require the code abbreviation, section number, and year or edition. Match the style required by your court, professor, or publisher.

Is this the official text of Nevada law?

No. This page is for research and education and may not include the most recent amendments. For official current law, check the Nevada official source linked on this page or consult a licensed Nevada attorney.

How does Nevada § 278.26503 apply to my situation?

Statutes are interpreted in context, and application depends on your specific facts. Only a licensed attorney in Nevada can advise on how this section applies to you. Contact your state or local bar association for a referral.

Sources & Verification

Not legal advice. Verify against the official source and consult a licensed attorney in Nevada.