§ 18-2-303. Construction Bids -- Minimum Requirements -- Effect Of Failure To Comply

Construction bids -- minimum requirements -- effect of failure to comply. (1) Each bid communicated to a state agency for the construction of a building must contain or be accompanied by the following items that may not be waived by the state agency: (a) bid security, as required by 18-2-302 ; (b) the unit price for each item required to be bid by unit price; and (c) the signature, including an electronic signature allowed under 60-2-113 , of an individual authorized to submit the bid and authorized by that submission to agree to perform the contract if the bid is accepted. If the request for bid or other specifications provided by the state agency specify the individual required to submit the bid, the bid must comply with that requirement. (2) The unit price must be expressly stated in the bid and may not have to be calculated by the state agency by dividing the total of the unit prices by the number of units specified or required. (3) A bid that does not include the items required by subsection (1) as part of or along with the bid may not be accepted by the state agency. (4) The following definitions apply to this section: (a) "Building" has the meaning provided in 18-2-101 . (b) "Construction" has the meaning provided in 18-2-101 . (c) "State agency" means a department, board, commission, authority, or office of a branch of state government, including the board of regents and the Montana university system. (d) "Unit price" means the price of lumber, concrete, earth, pipe, or other construction item, activity, or material for which the price is required by the request for bids to be bid on the basis of that item, a linear foot, square foot, square yard, cubic yard, activity an hour or other measurement of time, or other standard unit of measurement for that material, item, or activity.

Source: official Montana text · Last verified 2026-08-27

Frequently Asked Questions About Montana § 18-2-303

What does Montana Code Annotated § 18-2-303 cover?

Section 18-2-303 ("Construction Bids -- Minimum Requirements -- Effect Of Failure To Comply") is part of the Montana Code Annotated, the codified statutory law of Montana. It sets out the legal rule or procedure described in the text above. Statutes are amended regularly, so always verify against the official source.

How do I cite Montana § 18-2-303?

A common citation format is "Montana Code Annotated § 18-2-303" (Montana). Legal writing may require the code abbreviation, section number, and year or edition. Match the style required by your court, professor, or publisher.

Is this the official text of Montana law?

No. This page is for research and education and may not include the most recent amendments. For official current law, check the Montana official source linked on this page or consult a licensed Montana attorney.

How does Montana § 18-2-303 apply to my situation?

Statutes are interpreted in context, and application depends on your specific facts. Only a licensed attorney in Montana can advise on how this section applies to you. Contact your state or local bar association for a referral.