Missouri § 341.150 - Plumbing supervisor shall examine all applications and proposed plans for plumbing.

Full text of Missouri Revised Statutes of Missouri § 341.150 — Plumbing supervisor shall examine all applications and proposed plans for plumbing., with citation guidance and answers to common questions.

§ 341.150. Plumbing supervisor shall examine all applications and proposed plans for plumbing.

It shall be the duty of the plumbing supervisor to examine or cause to be examined all applications and proposed plans for the installation of plumbing and drainlaying, including all combined storm water and sanitary sewer or sanitary sewers and all connections thereto, and he shall examine and inspect all sewage treatment devices or equipment of whatever character and if found to be in conformity with the provisions of sections 341.090 to 341.220 and regulations adopted pursuant thereto, he shall approve such proposed installation and equipment and shall issue permits for the installation thereof.  He shall be required to investigate any report of the installation of defective work or materials not in conformity with the provisions of sections 341.090 to 341.220, and derogatory to established principles of public health and shall require the correction of such defective installation.  He shall inspect or cause inspection to be made of all water and sewer connections, and all repairs to water and sewer pipes where an excavation is required, all rough and finished plumbing installations, materials and fixtures, and all drainlaying, sanitary sewers and all connections thereto, and any and all sewage treatment, equipment or facilities, and require their installation in compliance with the provisions of sections 341.090 to 341.220 and the regulations adopted pursuant thereto.  He shall report to the prosecuting attorney any and all violations of sections 341.090 to 341.220 or the regulations adopted pursuant thereto.  He shall supervise the department of plumbing and sewer inspection and shall keep a proper book record of all transactions and shall make annual report thereof to the county commission and shall collect all fees required to be paid under the provisions of sections 341.090 to 341.220 and shall pay the same promptly into the county treasury.

­­--------

(L. 1943 p. 831 § 10)

---- end of effective  28 Aug 1943 ----

use this link to bookmark section  341.150

Source: official Missouri text · Last verified 2026-08-27

Frequently Asked Questions About Missouri § 341.150

What does Revised Statutes of Missouri § 341.150 cover?

Section 341.150 ("Plumbing supervisor shall examine all applications and proposed plans for plumbing.") is part of the Revised Statutes of Missouri, the codified statutory law of Missouri. It sets out the legal rule or procedure described in the text above. Statutes are amended regularly, so always verify against the official source.

How do I cite Missouri § 341.150?

A common citation format is "Revised Statutes of Missouri § 341.150" (Missouri). Legal writing may require the code abbreviation, section number, and year or edition. Match the style required by your court, professor, or publisher.

Is this the official text of Missouri law?

No. This page is for research and education and may not include the most recent amendments. For official current law, check the Missouri official source linked on this page or consult a licensed Missouri attorney.

How does Missouri § 341.150 apply to my situation?

Statutes are interpreted in context, and application depends on your specific facts. Only a licensed attorney in Missouri can advise on how this section applies to you. Contact your state or local bar association for a referral.

Sources & Verification

Not legal advice. Verify against the official source and consult a licensed attorney in Missouri.