Michigan § 460.1175 - Participation in distribution generation program; application fee; limitation; costs; interconnection requirements.
Full text of Michigan Michigan Compiled Laws § 460.1175 — Participation in distribution generation program; application fee; limitation; costs; interconnection requirements., with citation guidance and answers to common questions.
§ 460.1175. Participation in distribution generation program; application fee; limitation; costs; interconnection requirements.
(1) An electric utility or alternative electric supplier may charge a fee not to exceed $50.00 to process an application to participate in the distributed generation program. The customer shall pay all interconnection costs. The commission shall recognize the reasonable cost for each electric utility and alternative electric supplier to operate a distributed generation program. For an electric utility with 1,000,000 or more retail customers in this state, the commission shall include in that electric utility's nonfuel base rates all costs of meeting all program requirements except that all energy costs of the program shall be recovered through the utility's power supply cost recovery mechanism under section 6j of 1939 PA 3, MCL 460.6j. For an electric utility with fewer than 1,000,000 base distribution customers in this state, the commission shall allow that electric utility to recover all energy costs of the program through the power supply cost recovery mechanism under section 6j of 1939 PA 3, MCL 460.6j, and shall develop a cost recovery mechanism for that utility to contemporaneously recover all other costs of meeting the program requirements.
(2) The interconnection requirements of the distributed generation program shall provide that an electric utility or alternative electric supplier shall, subject to any time requirements imposed by the commission and upon reasonable written notice to the distributed generation customer, perform testing and inspection of an interconnected eligible electric generator as is necessary to determine that the system complies with all applicable electric safety, power quality, and interconnection, including metering, requirements. The costs of testing and inspection are considered a cost of operating a distributed generation program and shall be recovered under subsection (1).
(3) The interconnection requirements shall require all eligible electric generators, alternative electric suppliers, and electric utilities to comply with all applicable federal, state, and local laws, rules, or regulations, and any national standards as determined by the commission.
Frequently Asked Questions About Michigan § 460.1175
What does Michigan Compiled Laws § 460.1175 cover?
Section 460.1175 ("Participation in distribution generation program; application fee; limitation; costs; interconnection requirements.") is part of the Michigan Compiled Laws, the codified statutory law of Michigan. It sets out the legal rule or procedure described in the text above. Statutes are amended regularly, so always verify against the official source.
How do I cite Michigan § 460.1175?
A common citation format is "Michigan Compiled Laws § 460.1175" (Michigan). Legal writing may require the code abbreviation, section number, and year or edition. Match the style required by your court, professor, or publisher.
Is this the official text of Michigan law?
No. This page is for research and education and may not include the most recent amendments. For official current law, check the Michigan official source linked on this page or consult a licensed Michigan attorney.
How does Michigan § 460.1175 apply to my situation?
Statutes are interpreted in context, and application depends on your specific facts. Only a licensed attorney in Michigan can advise on how this section applies to you. Contact your state or local bar association for a referral.
Sources & Verification
Not legal advice. Verify against the official source and consult a licensed attorney in Michigan.