Maryland § 15-510

Full text of Maryland Maryland Code § 15-510, with citation guidance and answers to common questions.

§ 15-510.

    (a)    Each operator shall comply with the requirements of this section.

    (b)    (1)    The operator shall regrade in a manner the Department establishes by rule and regulation and in accordance with the approved reclamation plan. Any regrading shall include, but is not limited to, backfilling, compacting (where necessary to insure stability or prevent leaching of toxic materials), and regrading to restore to the approximate original contour of the affected area with all highwalls, spoil piles, and depressions eliminated, unless depressions are approved by the Department to prevent erosion and retain moisture to assist revegetation.

        (2)    All spoil from a permitted area shall be reclaimed within that permitted area or placed on abandoned mine land in a manner approved by the Department. Spoil from a permitted area may not be placed on abandoned mine land if it is needed to achieve the approximate original contour within that permitted area or to meet other permit requirements.

    (c)    The operator shall seal off with a material approved by the Department each opening from an underground mining operation at the base of the final cut. The seal shall be constructed in a way to avoid creating danger from impoundment of any large quantity of water.

    (d)    If the operator proposes to impound water to provide a lake or pond for wildlife, recreational, or other water supply purposes, he shall file a formal request with the Department and receive approval before the pond or lake is created.

    (e)    An operator, with the written approval of the landowner, may propose an alternative plan for reclamation if the land can be used for suitable purposes. The alternate plan shall be submitted to the Department as part of the mining and reclamation plan.

    (f)    Unless the operator obtains the prior written approval of the Department, all backfilling described in the approved reclamation plan shall be completed before backfilling equipment is moved from the operation.

    (g)    An owner of either surface rights or mineral rights may not interfere with an operator in the discharge of any duties imposed by this subtitle.

Frequently Asked Questions About Maryland § 15-510

What does Maryland Code § 15-510 cover?

Section 15-510 is part of the Maryland Code, the codified statutory law of Maryland. It sets out the legal rule or procedure described in the text above. Statutes are amended regularly, so always verify against the official source.

How do I cite Maryland § 15-510?

A common citation format is "Maryland Code § 15-510" (Maryland). Legal writing may require the code abbreviation, section number, and year or edition. Match the style required by your court, professor, or publisher.

Is this the official text of Maryland law?

No. This page is for research and education and may not include the most recent amendments. For official current law, check the Maryland official source linked on this page or consult a licensed Maryland attorney.

How does Maryland § 15-510 apply to my situation?

Statutes are interpreted in context, and application depends on your specific facts. Only a licensed attorney in Maryland can advise on how this section applies to you. Contact your state or local bar association for a referral.

Sources & Verification

Not legal advice. Verify against the official source and consult a licensed attorney in Maryland.