Guam § 14241 - Approval of Financing and Construction Options to Alleviate Emergency Conditions in the
Full text of Guam Guam Code Annotated § 14241 — Approval of Financing and Construction Options to Alleviate Emergency Conditions in the, with citation guidance and answers to common questions.
§ 14241. Approval of Financing and Construction Options to Alleviate Emergency Conditions in the
Guam Waterworks Authority’s Water and Wastewater System.
(a) Notwithstanding any other provision of law, in order to eliminate the emergency that currently
exists relative to the current Guam Waterworks Authority’s moratorium on sewer connections in Central
Guam, the Guam Waterworks Authority is hereby authorized to enter into long-term and short-term
financing agreements, credit facilities and other construction and procurement models which are necessary
to rapidly alleviate the moratorium in order to promote economic growth on Guam for the betterment of
all, provided, however, that said financing shall be issued subject to the terms and conditions of GWA’s
2005 Series Bond Indenture and any other supplemental indenture issued by the Authority under P.L. 28-
071.
(b) Financing agreements, credit facilities and procurement methods can include, but are not limited
to, the following:
(1) qualified public activity bonds;
(2) certificates of participation;
(3) design-build-finance agreements;
(4) build-operate-transfer agreements;
(5) build-lease agreements;
(6) lease-to-own agreements; and
(7) any other credit facility or financing agreement approved by the Consolidated Commission
on Utilities.
(c) All contracts for financing and construction entered into under this Section shall be subject to the
approval of the Guam Public Utilities Commission under the Contract Review Protocol.
(d) All financing entered into under this Section shall be subject to the approval of the Guam Economic
Development Authority (GEDA) and all fees due to GEDA under existing statutes to GEDA shall apply.
However, all other provisions of § 50103(k) of Title 12, Guam Code Annotated, shall not apply.
COL 2025-12-23
(e) Prior to issuing any financing under this provision, the Guam Waterworks Authority shall obtain a
legal opinion from a licensed Bond Counsel designated by the Authority who possesses a national
reputation for expertise in matters relating to governmental obligations, the interest on which is excluded
from gross income for federal income tax purposes under Section 103 of the United States’ Internal Revenue
Code.
(f) In view of the urgency for the procurement in order to lift the moratorium in Central Guam and
only for the project as defined herein, the requirements of Chapter 5, Title 5, Guam Code Annotated, are
hereby waived and the Guam Waterworks Authority is hereby authorized to utilize such method of source
selection as it deems necessary, subject to the approval of the Guam Public Utilities Commission under the
Contract Review Protocol and with all financing to be approved by the Guam Economic Development
Authority. However, the following minimum limitations apply to the procurement for this project:
(1) A competitive selection request shall be published in a newspaper published on Guam for on
at least two (2) occasions at least thirty (30) days prior to the date set to select the best bid/proposal to
GWA based on the lowest overall life cycle costs and financing; and
(2) GWA shall not use sole source as a method of selecting the successful bidder/proposer.
(g) The “moratorium project” is defined to mean:
(1) Upgrades to the Mamajanao Sewage Pump Station (SPS): This will include an extension of
the force main down the hill to a new terminating manhole and will control the flows from the pumping
station.
(2) Route 16 Pump Station Operational Measures: Increase risk management measures at the
Route 16 sewage pump station and eliminate the flow split to the south.
(3) Route 4 Wastewater Piping: Pipe the flow from the New Chaot SPS directly to the Hagåtña
WWTP.
(4) Tamuning Pump Station: Build a new sewage pump station in Tamuning that will collect all
of the flow from Marine Corps Drive and pump it directly to the Hagåtña WWTP.
(5) Hagåtña Main Pump Station: Upgrade the Hagåtña Main SPS and provide a fat, oil, grease
and grit removal system at Hagåtña WWTP to enhance overall operability.
(6) Other works associated with the above scope as proposed or identified during the bidding
process.
Source: official Guam text · Last verified 2026-08-27
Frequently Asked Questions About Guam § 14241
What does Guam Code Annotated § 14241 cover?
Section 14241 ("Approval of Financing and Construction Options to Alleviate Emergency Conditions in the") is part of the Guam Code Annotated, the codified statutory law of Guam. It sets out the legal rule or procedure described in the text above. Statutes are amended regularly, so always verify against the official source.
How do I cite Guam § 14241?
A common citation format is "Guam Code Annotated § 14241" (Guam). Legal writing may require the code abbreviation, section number, and year or edition. Match the style required by your court, professor, or publisher.
Is this the official text of Guam law?
No. This page is for research and education and may not include the most recent amendments. For official current law, check the Guam official source linked on this page or consult a licensed Guam attorney.
How does Guam § 14241 apply to my situation?
Statutes are interpreted in context, and application depends on your specific facts. Only a licensed attorney in Guam can advise on how this section applies to you. Contact your state or local bar association for a referral.
Sources & Verification
Not legal advice. Verify against the official source and consult a licensed attorney in Guam.