Georgia § 50-8-18 - Energy efficient construction of major state-funded facility projects; short title; legislative findings; "major facility project" defined.

Full text of Georgia Official Code of Georgia Annotated § 50-8-18 — Energy efficient construction of major state-funded facility projects; short title; legislative findings; "major facility project" defined., with citation guidance and answers to common questions.

§ 50-8-18. Energy efficient construction of major state-funded facility projects; short title; legislative findings; "major facility project" defined.

This Code section shall be known and may be cited as the "Energy Efficiency and Sustainable Construction Act of 2008." The General Assembly finds that the welfare of this state is enhanced by the promotion of effective energy and environmental standards for construction, rehabilitation, and maintenance of state-funded facilities and that such standards in turn improve this state's capacity to design, build, and operate high-performance buildings, contributing to economic growth, promoting job development, and increasing energy conservation. For purposes of this Code section, the term "major facility project" means a state-funded: New construction building project of a building exceeding 10,000 square feet; A renovation project that is more than 50 percent of the replacement value, as determined by the Department of Administrative Services Risk Management Division, of the facility, a change in occupancy, or any roof replacement project exceeding 10,000 square feet; or A commercial interior tenant fit-out project exceeding 10,000 square feet of leasable area where the state is intended to be the lessor of such property. A major facility project shall not include a building, regardless of size, that does not have conditioned space as defined by the American Society of Heating, Refrigerating, and Air-Conditioning Engineers (ASHRAE) and shall not include a state owned building that is on the historical registry or any local, county, or municipal building. Consistent with the intent of this Code section, the department, in consultation with the Georgia State Financing and Investment Commission, shall adopt policies and procedures as recommended standards for all buildings owned or managed by this state that: Optimize the energy performance; Increase the demand for construction materials and furnishings produced in Georgia; Improve the environmental quality in this state by decreasing the discharge of pollutants from such state buildings; Conserve energy and utilize local and renewable energy sources; Protect and restore this state's natural resources by avoiding the development of inappropriate building sites; Reduce the burden on municipal water supply and treatment by reducing potable water consumption; Establish life cycle assessments as the appropriate and most efficient analysis to determine a building project's environmental performance level; and Encourage obtaining Energy Star designation from the United States Environmental Protection Agency to further demonstrate a building project's energy independence. All major facility projects may be designed, constructed, and commissioned or modeled to exceed the standards set forth in ASHRAE 90.1.2004 by 30 percent where it is determined by the department that such 30 percent efficiency is cost effective based on a life cycle cost analysis with a payback at no more than ten years. Commissioning or modeling must be performed by a professional engineer, design professional, or commissioning agent using software methodology approved by the Internal Revenue Service, the Department of Energy, current ASHRAE standards, or other similar methodology. For all major renovation projects, such requirements shall apply to the specific building assemblies, envelope components, and equipment involved in the project. All major facility projects shall be designed, constructed, and commissioned or modeled to achieve a 15 percent reduction in water use when compared to water use based on plumbing fixture selection in accordance with the Energy Policy Act of 1992. To achieve sustainable building standards, construction projects may utilize a nationally recognized high performance energy modeling and environmental building rating system; provided, however, that any such rating system that uses a material or product based credit system that operates to the detriment of materials or products manufactured or produced in Georgia shall not be utilized. The department shall designate rating systems that meet these criteria and is authorized to establish its own alternative rating system. All major facility projects shall include Georgia products such that not less than 10 percent of all building materials used in a project are harvested, extracted, or manufactured in the State of Georgia where such products are commercially available in a manner consistent with the purposes of this Code section. A professional engineer, design professional, or commissioning agent shall certify that the building project's systems for heating, ventilating, air conditioning, energy conservation, and water conservation are installed and working properly to ensure that each building project performs according to the building's overall environmental design intent and operational objectives. (Code 1981, § 50-8-18 , enacted by Ga. L. 2008, p. 224, § 4/SB 130; Ga. L. 2014, p. 866, § 50/SB 340; Ga. L. 2017, p. 774, § 50/HB 323.) The 2014 amendment, effective April 29, 2014, part of an Act to revise, modernize, and correct the Code, substituted "Georgia State Financing and Investment Commission" for "Georgia State Finance and Investment Commission" in the introductory language of subsection (d). The 2017 amendment, effective May 9, 2017, part of an Act to revise, modernize, and correct the Code, revised punctuation in subsection (c). Editor's notes. - Ga. L. 2008, p. 224, § 7/SB 130, not codified by the General Assembly, provides that this Code section shall apply to design agreements for major facilities projects entered into on or after July 1, 2010. U.S. Code. - The Energy Policy Act of 1992, referred to in subsection (f), is codified at 42 U.S.C. § 13201 et seq.

Source: official Georgia text · Last verified 2026-08-27

Frequently Asked Questions About Georgia § 50-8-18

What does Official Code of Georgia Annotated § 50-8-18 cover?

Section 50-8-18 ("Energy efficient construction of major state-funded facility projects; short title; legislative findings; "major facility project" defined.") is part of the Official Code of Georgia Annotated, the codified statutory law of Georgia. It sets out the legal rule or procedure described in the text above. Statutes are amended regularly, so always verify against the official source.

How do I cite Georgia § 50-8-18?

A common citation format is "Official Code of Georgia Annotated § 50-8-18" (Georgia). Legal writing may require the code abbreviation, section number, and year or edition. Match the style required by your court, professor, or publisher.

Is this the official text of Georgia law?

No. This page is for research and education and may not include the most recent amendments. For official current law, check the Georgia official source linked on this page or consult a licensed Georgia attorney.

How does Georgia § 50-8-18 apply to my situation?

Statutes are interpreted in context, and application depends on your specific facts. Only a licensed attorney in Georgia can advise on how this section applies to you. Contact your state or local bar association for a referral.

Sources & Verification

Not legal advice. Verify against the official source and consult a licensed attorney in Georgia.