Connecticut § 16-244cc - Energy storage systems pilot program.

Full text of Connecticut Connecticut General Statutes § 16-244cc — Energy storage systems pilot program., with citation guidance and answers to common questions.

§ 16-244cc. Energy storage systems pilot program.

Sec. 16-244cc. Energy storage systems pilot program. (a) The Public Utilities Regulatory Authority shall direct each electric distribution company, as defined in section 16-1, to submit on or before January 1, 2023, no more than three proposals to the authority for a pilot program for the company to build, own and operate energy storage systems, as defined in section 16-1, for the purpose of demonstrating and investigating how energy storage systems can improve resiliency of critical infrastructure and improve reliability of the electric distribution system.

(b) The authority shall approve or modify a proposal if it concludes that investment in such energy storage systems is reasonable, prudent and provides value to ratepayers.

(c) An electric distribution company may recover its prudently incurred costs made pursuant to this section through a fully reconciling component of electric rates for all customers until the electric distribution company's next rate case, at which time such costs and investments shall be recoverable through base distribution rates consistent with the principles set forth in sections 16-19 and 16-19e.

(d) For any completed energy storage system, the company shall maximize the value from the system's participation in wholesale electricity, capacity or other markets, as applicable, while maintaining distribution system reliability. Any net revenues from such participation shall be credited to ratepayers to offset the cost of the completed system in rates.

(e) The provisions of this section shall not be construed to impose any limitations or caps upon section 16-244e.

(P.A. 22-55, S. 2.)

History: P.A. 22-55 effective May 23, 2022.

Frequently Asked Questions About Connecticut § 16-244cc

What does Connecticut General Statutes § 16-244cc cover?

Section 16-244cc ("Energy storage systems pilot program.") is part of the Connecticut General Statutes, the codified statutory law of Connecticut. It sets out the legal rule or procedure described in the text above. Statutes are amended regularly, so always verify against the official source.

How do I cite Connecticut § 16-244cc?

A common citation format is "Connecticut General Statutes § 16-244cc" (Connecticut). Legal writing may require the code abbreviation, section number, and year or edition. Match the style required by your court, professor, or publisher.

Is this the official text of Connecticut law?

No. This page is for research and education and may not include the most recent amendments. For official current law, check the Connecticut official source linked on this page or consult a licensed Connecticut attorney.

How does Connecticut § 16-244cc apply to my situation?

Statutes are interpreted in context, and application depends on your specific facts. Only a licensed attorney in Connecticut can advise on how this section applies to you. Contact your state or local bar association for a referral.

Sources & Verification

Not legal advice. Verify against the official source and consult a licensed attorney in Connecticut.