California § 17309 - From time to time, as the work of construction or alteration progresses and whene
Full text of California Public Contract Code - PCC § 17309 — From time to time, as the work of construction or alteration progresses and whene, with citation guidance and answers to common questions.
§ 17309. From time to time, as the work of construction or alteration progresses and whene
From time to time, as the work of construction or alteration progresses and whenever the Department of General Services requires, the licensed architect or structural engineer in charge of observation of construction or registered engineer in charge of observation of other work, the inspector on the work, and the contractor shall each make to the Department of General Services a report, duly verified by him or her, upon a form prescribed by the Department of General Services, based upon his or her own personal knowledge, indicating that the work during the period covered by the report has been performed and materials have been used and installed, in every material respect, in compliance with the approved plans and specifications, setting forth such detailed statements of fact as are required by the Department of General Services. The term âpersonal knowledgeâ as used in this section and as applied to the architect, and the registered engineer, means the personal knowledge which is obtained from periodic visits to the project site of reasonable frequency for the purpose of general observation of the work, and also which is obtained from the reporting of others as to the progress of the work, testing of materials, inspection and superintendence of the work that is performed between the above-mentioned periodic visits of the architect or the registered engineer. The exercise of reasonable diligence to obtain the facts is required. The term âpersonal knowledgeâ as applied to the inspector means the actual personal knowledge which is obtained from his or her personal continuous inspection of the work of construction in all stages of its progress at the site where he is responsible for inspection and, when work is carried out away from the site, that personal knowledge which is obtained from the reporting of others on the testing or inspection of materials and workmanship for compliance with plans, specifications or applicable standards. The exercise of reasonable diligence to obtain the facts is required. The term âpersonal knowledgeâ as applied to the contractor means the personal knowledge which is obtained from the construction of the building. The exercise of reasonable diligence to obtain the facts is required.
Source: official California text · Last verified 2026-08-27
Frequently Asked Questions About California § 17309
What does Public Contract Code - PCC § 17309 cover?
Section 17309 ("From time to time, as the work of construction or alteration progresses and whene") is part of the Public Contract Code - PCC, the codified statutory law of California. It sets out the legal rule or procedure described in the text above. Statutes are amended regularly, so always verify against the official source.
How do I cite California § 17309?
A common citation format is "Public Contract Code - PCC § 17309" (California). Legal writing may require the code abbreviation, section number, and year or edition. Match the style required by your court, professor, or publisher.
Is this the official text of California law?
No. This page is for research and education and may not include the most recent amendments. For official current law, check the California official source linked on this page or consult a licensed California attorney.
How does California § 17309 apply to my situation?
Statutes are interpreted in context, and application depends on your specific facts. Only a licensed attorney in California can advise on how this section applies to you. Contact your state or local bar association for a referral.
Sources & Verification
Not legal advice. Verify against the official source and consult a licensed attorney in California.