California § 12668 - The project for flood control on the San Joaquin River is adopted and authorized
Full text of California Public Contract Code - PCC § 12668 — The project for flood control on the San Joaquin River is adopted and authorized, with citation guidance and answers to common questions.
§ 12668. The project for flood control on the San Joaquin River is adopted and authorized
(a) The project for flood control on the San Joaquin River is adopted and authorized substantially in accordance with P.L. 98-63, at a federal cost of approximately eight million dollars ($8,000,000), for the accomplishment of selective clearing and snagging work in the San Joaquin Channel, from Friant Dam to the Stockton Deep Water Channel, and in that area of the North Fork of the Kings River and Mendota Pool from the southerly boundary of the James Reclamation District No. 1606 to Mendota Dam. Because of the unique situation presented by this project, the department shall maintain and operate, on behalf of the state, the work performed by the Corps of Engineers on this project, and the cost of that maintenance and operation shall be borne by the state. (b) Any assurance agreement entered into between the Secretary of the Army and the Reclamation Board for this project shall provide for mitigation of the impact of the project with the objective of providing a net long-term enhancement of the riparian habitat and fishery in the project area. (c) It is the intent of the Legislature, in reviewing future projects, to improve the capacity of the San Joaquin River to provide for mitigation of the impact of the project and net long-term enhancement of the riparian habitats and fisheries in the project area. (d) The Legislature finds and declares that the local responsibility of maintenance of this and future federal projects in and along the San Joaquin River may be better, more efficiently, and more fairly fulfilled by geographically larger, or regional, local public entities. The Legislature, therefore, directs the Reclamation Board, in coordination with the department, to study the possibility of creating, by a joint powers agreement or by special act of the Legislature, one or more regional districts to undertake at a future time local maintenance responsibility for this project. The Reclamation Board shall report its findings to the Legislature not later than December 31, 1985.
Source: official California text · Last verified 2026-08-27
Frequently Asked Questions About California § 12668
What does Public Contract Code - PCC § 12668 cover?
Section 12668 ("The project for flood control on the San Joaquin River is adopted and authorized") is part of the Public Contract Code - PCC, the codified statutory law of California. It sets out the legal rule or procedure described in the text above. Statutes are amended regularly, so always verify against the official source.
How do I cite California § 12668?
A common citation format is "Public Contract Code - PCC § 12668" (California). Legal writing may require the code abbreviation, section number, and year or edition. Match the style required by your court, professor, or publisher.
Is this the official text of California law?
No. This page is for research and education and may not include the most recent amendments. For official current law, check the California official source linked on this page or consult a licensed California attorney.
How does California § 12668 apply to my situation?
Statutes are interpreted in context, and application depends on your specific facts. Only a licensed attorney in California can advise on how this section applies to you. Contact your state or local bar association for a referral.
Sources & Verification
Not legal advice. Verify against the official source and consult a licensed attorney in California.