California § 12661.5 - The project for flood control on the Kaweah River, Terminus Dam, is adopted and a

Full text of California Public Contract Code - PCC § 12661.5 — The project for flood control on the Kaweah River, Terminus Dam, is adopted and a, with citation guidance and answers to common questions.

§ 12661.5. The project for flood control on the Kaweah River, Terminus Dam, is adopted and a

(a) The project for flood control on the Kaweah River, Terminus Dam, is adopted and authorized substantially in accordance with the recommendations of the Chief of Engineers, in the report “Kaweah River Basin Investigation Feasibility Study, California,” dated December 23, 1996, and as adopted and authorized by the Water Resources Development Act of 1996 as approved by Congress on October 12, 1996 (Public Law 104-303), at an estimated cost to the state of the sum that may be appropriated by the Legislature for state participation, upon the recommendation and advice of the Reclamation Board. The Reclamation Board may pay 50 percent of the nonfederal capital costs of the recreation and fish and wildlife enhancement features of the project. (b) The Kaweah Delta Water Conservation District may, in lieu of the Reclamation Board, give assurances satisfactory to the Secretary of the Army that the local cooperation required by federal law, including the Water Resources Development Act of 1996, will be furnished in connection with the project. (c) The Kaweah Delta Water Conservation District, in conjunction with the Department of the Army, may, in lieu of the Reclamation Board, carry out the plans and project and may make modifications and amendments of the plans as necessary to carry out the plans for the purposes of Chapter 1 (commencing with Section 12570) and this chapter. (d) Authorization of the project shall be contingent upon the recommendation, advice, and approval of the Reclamation Board and upon the expenditure of two hundred thousand dollars ($200,000) by the department for local assistance for the project.

Source: official California text · Last verified 2026-08-27

Frequently Asked Questions About California § 12661.5

What does Public Contract Code - PCC § 12661.5 cover?

Section 12661.5 ("The project for flood control on the Kaweah River, Terminus Dam, is adopted and a") is part of the Public Contract Code - PCC, the codified statutory law of California. It sets out the legal rule or procedure described in the text above. Statutes are amended regularly, so always verify against the official source.

How do I cite California § 12661.5?

A common citation format is "Public Contract Code - PCC § 12661.5" (California). Legal writing may require the code abbreviation, section number, and year or edition. Match the style required by your court, professor, or publisher.

Is this the official text of California law?

No. This page is for research and education and may not include the most recent amendments. For official current law, check the California official source linked on this page or consult a licensed California attorney.

How does California § 12661.5 apply to my situation?

Statutes are interpreted in context, and application depends on your specific facts. Only a licensed attorney in California can advise on how this section applies to you. Contact your state or local bar association for a referral.

Sources & Verification

Not legal advice. Verify against the official source and consult a licensed attorney in California.