California § 1005.5 - Whenever the commission issues to an electrical or gas corporation a certificate

Full text of California Public Contract Code - PCC § 1005.5 — Whenever the commission issues to an electrical or gas corporation a certificate, with citation guidance and answers to common questions.

§ 1005.5. Whenever the commission issues to an electrical or gas corporation a certificate

(a) Whenever the commission issues to an electrical or gas corporation a certificate authorizing the new construction of any addition to or extension of the corporation’s plant estimated to cost greater than fifty million dollars ($50,000,000), the commission shall specify in the certificate a maximum cost determined to be reasonable and prudent for the facility. The commission shall determine the maximum cost using an estimate of the anticipated construction cost, taking into consideration the design of the project, the expected duration of construction, an estimate of the effects of economic inflation, and any known engineering difficulties associated with the project. (b) After the certificate has been issued, the corporation may apply to the commission for an increase in the maximum cost specified in the certificate. The commission may authorize an increase in the specified maximum cost if it finds and determines that the cost has in fact increased and that the present or future public convenience and necessity require construction of the project at the increased cost; otherwise, it shall deny the application. (c) After construction has commenced, the corporation may apply to the commission for authorization to discontinue construction and recover those costs which were reasonably and prudently incurred. After a showing to the satisfaction of the commission that the present or future public convenience and necessity no longer require the completion of construction of the project, the commission may authorize discontinuance of construction and the recovery of those construction costs which were reasonable and prudent. (d) In any decision establishing rates for an electrical or gas corporation reflecting the reasonable and prudent costs of the new construction of any addition to or extension of the corporation’s plant, when the commission has found and determined that the addition or extension is used and useful, the commission shall consider whether or not the actual costs of construction are within the maximum cost specified by the commission.

Source: official California text · Last verified 2026-08-27

Frequently Asked Questions About California § 1005.5

What does Public Contract Code - PCC § 1005.5 cover?

Section 1005.5 ("Whenever the commission issues to an electrical or gas corporation a certificate") is part of the Public Contract Code - PCC, the codified statutory law of California. It sets out the legal rule or procedure described in the text above. Statutes are amended regularly, so always verify against the official source.

How do I cite California § 1005.5?

A common citation format is "Public Contract Code - PCC § 1005.5" (California). Legal writing may require the code abbreviation, section number, and year or edition. Match the style required by your court, professor, or publisher.

Is this the official text of California law?

No. This page is for research and education and may not include the most recent amendments. For official current law, check the California official source linked on this page or consult a licensed California attorney.

How does California § 1005.5 apply to my situation?

Statutes are interpreted in context, and application depends on your specific facts. Only a licensed attorney in California can advise on how this section applies to you. Contact your state or local bar association for a referral.

Sources & Verification

Not legal advice. Verify against the official source and consult a licensed attorney in California.